My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123772
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:28 PM
Creation date
11/25/2007 11:53:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
BOND COST WORKSHEETS
Section_Exhibit Name
Tab 23 ATTACHMENT 23-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />HAYDEN GULCH TERMINAL, INC DOZER PRODUCTION <br />2000 TR-5- HAYDEN GULCH LOADOUT <br />PONDS DATE: 13Jun-00 <br />SUMMARY SHEET <br />EQUIPMENT REQUIRED <br />-CATERPILLAR D10N DOZER <br />VOLUME TO BE MOVED <br />TOTAL VOLUME 4,000 BCY <br />DOZING PRODUCTION <br />DOZING DISTANCE 100 FT <br />GRADE 0 <br />BLADE TYPE U <br />MATERIAL DENSITY 2545 LCY <br />PRODUCTION 1766 LCY/SCH HR <br />GRADE FACTOR 1 <br />DENSITY FACTOR 0.90 <br />SLOT DOZING 1 <br />MATERIAL 1 <br />VISIBILITY 1 <br />ALTITUDE 1 <br />SPOIL FACTOR 1 <br />UTILIZATION FACTOR 0.75 <br />OPERATOR EFFICIENCY 0.75 <br />ADJ. PRODUCTIVITY 898 LCY/SCH HR <br />SWELL FACTOR 26% <br />ADJ. PRODUCTIVITY 712 BCY/SCH HR <br />DOZER FLEET COST TOTAL EQUIP. <br /> 8 LABOR UNIT TOTAL <br />EQUIPMENT UNITS COST COST <br />DOZER 1 $198.29 $198.29 /SCH HR <br />TOTAL COST <br />Hours CosUHour Total <br />6 $198.29 $1,113 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.