Laserfiche WebLink
HAYDEN GULCH TERMINAL, INC <br />2000 TR-5- HAYDEN GULCH LOADOUT <br />BALLAST REMOVAL <br />SUMMARY SHEET <br />VOLUME TO BE MOVED <br />9,350 tons <br />SCRAPER FLEET COST <br />EQUIPMENT UNITS <br />SCRAPER 2 <br />14-G 0.25 <br />WATER TRK 0.25 <br />TOTAL COST <br />• 1 See FPC Worksheets <br />Hours (1) <br />19 <br />TOTAL EQUIP. <br />& LABOR UNIT <br />COST <br />$239.97 <br />$89.50 <br />$68.77 <br />CosUHour Total <br />$519.51 $9,871 <br />TOTAL <br />COST <br />$479.94 /SCH HR <br />$22.38 ISCH HR <br />$17.19 /SCH HR <br />I~ <br />