Laserfiche WebLink
HAYDEN GULCH TERMINAL, INC <br />2000 TR-S- HAYDEN GULCH LOADOUT <br />CULVERT REMOVAL <br />SUMMARY SHEET <br /> <br />Culvert Location Diameter Length CosUFoot Total Cost <br />(inches) (feet) <br />RRC 1 18 45 $8.00 $360 <br />2 18 64 $8.00 $512 <br />3 18 64 $8.00 $512 <br />4 24 32 $8.00 $256 <br />5 24 37 $8.00 $296 <br />6 18 41 $8.00 $328 <br />7 18 43 $8.00 $344 <br />8 24 45 $8.00 $360 <br />9 18 45 $8.00 $360 <br />10 18 44 $8.00 $352 <br />11 18 37 $8.00 $296 <br />12 36 100 $17.00 $1,700 <br />13 42 100 $21.00 $2,100 <br />14 42 52 $21.00 $1,092 <br />15 18 36 $8.00 $288 <br />16 60 113 $37.00 $4,181 <br />17A 120 165 $46.00 $7,590 <br />178 108 165 $46.00 $7,590 <br />• 17C 120 165 $46.00 $7,590 <br />18 24 50 $8.00 $400 <br />19A 108 90 $46.00 $4,140 <br />196 108 90 $46.00 $4,140 <br />19C 108 90 $46.00 $4,140 <br />20 60 52 $37.00 $1,924 <br />21 18 95 $8.00 $760 <br />LFC 1 18 55 $8.00 $440 <br />2 12 15 $8.00 $120 <br />3 24 166 $8.00 $1,328 <br />4 36 28 $17.00 $476 <br />5 24 60 $8.00 $480 <br />6 24 60 $8.00 $480 <br />7 24 60 $8.00 $480 <br />9 24 56 $8.00 $448 <br />10A 72 105 $40.00 $4,200 <br />10B 72 105 $40.00 $4,200 <br />tOC 72 105 $40.00 $4,200 <br />11 12 123 $8.00 $984 <br />12 24 90 $8.00 $720 <br />TOTAL <br />$70,167 <br />I• <br />