<br />HAYDEN GULCH TERMINAL, INC
<br />2000 TR-S- HAYDEN GULCH LOADOUT
<br />FACILITIES DEMOLITION
<br />SUMMARY SHEET
<br />STRUCTURE DESCRIPTION DIMENSION pTV. UNIT MAT. LABOR EOUIPME UNIT TOTA TOTAL COST MEANS SECTION
<br />Office 24x65x10 15.600 cu h. $ 007 $ 0.11 $ 0.16 S 2,808 020.fi04-0700
<br />Truck Dump Hopper
<br />Fmming Oemo 4'x6' beams 300 n $ 3.15 $ 1.96 $ 5.11 $ 1,533 020.714-2020
<br />Sleet Plate Cunmg 1' Mick 100 m $ 5.15 S 5.15 S 515 020-730.0010
<br />Footers 1'x2' 104 1tt $ 4.28 S 3.37 $ 7.65 $ 796 020.754-1000
<br />Conc. Wall 6' 832 Itt S 5.25 $ 1.OB $ 6.33 $ 5,267 020.754-2400
<br />Total S 8,110
<br />Train Hopper
<br />Remove Steel 10 Day S 1,30120 5 549.35 S 1,850.55 5 18.506 B-13 Crew
<br />BacMill Concrete Boz 12,000 ry $ 0.40 3 4,822 Spreatlsheet
<br />Disposal off site 5 Miles 500 ry $ 2.51 $ 3.9fi $ 6.47 $ 3,235 020-608-0200
<br />Total $ 26,563
<br />Stacker
<br />Framing and Conveyor Demo S Day $ 1.301.20 $ 549.35 $ 1,850.55 $ 9,253 613 Crew
<br />Footers 1'x2' 174 m S 4.26 $ 3.37 $ 7.65 $ 1,331 020-754-1000
<br />Foundation 500 sf $ 10.50 $ 2.16 $ 12.66 $ 6,330 020-754-2500
<br />Disposal off site 5 Miles 300 ry S 2.51 $ 3.96 $ 6.47 S 1.941 020-608-0200
<br />Disposal on Site 120 cY $ 1 66 $ 359 $ 525 $ 630 020-7544200
<br />Total $ 19.485
<br />Reclaim Tunnel
<br />Remove COrrveyor 5 Day $ 1,301.20 $ 549.35 $ 1,850.55 $ 9,253 &13Crew
<br />Collapse TOp 120'x14' 1680 sf $ 3.03 $ 0.63 $ 3.66 $ 6,149 020.714-1660
<br />Backfiil Concrete Box 800 cY $ 0.40 $ 321 Spreadsheet
<br />Disposal off Site SMiles 200 ry $ 2.51 $ 3.96 $ 6.47 S 1,294 020.fi08-0200
<br />Total $ 17,017
<br />Crusher
<br />Builtlinq 25'x30'z30 22,500 cWt $ 0.07 $ 0.11 $ 0.18 $ d,050 020-6040500
<br />Freminq Demo 4'z6' 240 m $ 3.15 $ 1.96 $ 5.11 $ 1,226 020.7142020
<br />Forming Demo 6'x6' 500 Itt $ 3.15 $ 1.96 $ 5.11 $ 2,555 020.714-2200
<br />Framing Demo 10'z12' 100 m $ 5.60 S 3.49 $ 9.09 $ 909 020.714-2400
<br />Disposal of ska 5 Miles 100 ry $ 2.51 $ 3.96 $ 64) $ ~ 647 020.608-0200
<br />Foundation 1,000 sl $ 5.25 $ 108 $ 6.33 $ 6.330 020]Sd-2400
<br />Disposal on SHe 50 ry $ 1.66 $ 3.59 $ 5.25 $ 263 020-754-4200
<br />Total $ 15,980
<br />Conveyors and Slack Tube
<br />Framing Demo 4'x6' 2,520 Ht $ 3.15 5 1.96 $ 5.11 $ 12,8]] 020714.2020
<br />Steel Plate Cutting 1' mick 100 Ht $ 5.15 S 5.15 $ 515 020-]30.0010
<br />Steel Bar Cutting 1' 500 $ 0.]9 S 0.79 $ 395 020.730-0040
<br />Disposal pH site 5 Miles 200 ry $ 2.51 $ 3.96 5 6.47 S 1,294 020.608-0200
<br />Total $ 15,081
<br />Train LoaOON
<br />Framing Demo 8'x12' 1,000 m $ 5.05 $ 3.14 $ 8.19 $ 8.190 020-714-2080
<br />Framing Demo 10'x10' 1,000 Itt $ 3.93 S 2.45 S 6.38 $ 6,380 020-71b2280
<br />Framing Demo 10'x16' 700 m $ 7.65 $ 4.76 $ 12.41 S B,6B7 020.714-2480
<br />Steal Plate tuning 1'thick 500 Ht $ 5.15 $ 5.15 S 2,575 020-730-0010
<br />Disposal of silo 5 Milea 200 ry $ 2.51 $ 3.96 $ 6.47 $ 1,294 020608-0200
<br />Total S 27,126
<br />5 Small Metal Buildings
<br />Building 13,010 cf $ 0.07 5 0.11 $ 0.18 5 2.342 020-604-0500
<br />Conc. Pad 1,300 sf $ 1.75 $ 0.30 S 2.05 $ 2,665 0207540240
<br />Glean Out 1,300 sf $ 2.02 $ 1.26 $ 328 $ 4,264 0207161000
<br />Total A 3 9,271
<br />Water Tank
<br />Remove 14'x25' 1 Day $ 1,301.20 $ 549.35 $ 1,850.55 $ 1,851 &13 Crew
<br />Rail Road
<br />Tracks and Ties 17,424 tt $ 3.94 S 1.66 $ 5.60 $ 97,574 02055b3500
<br />Concrete
<br />OisDOSaI on Site 500 ty $ 1.66 $ 3.59 $ 5.25 $ 2,625 02075b4200
<br />Substation
<br />Conc. Pad 25' z 40' 1000 sf S 2.75 0.53 E 3.28 S 3.280 020.7540420
<br />TOTAL $ 246.]71