Laserfiche WebLink
<br /> <br />HAYDEN GULCH TERMINAL, INC <br />2000 TR-S- HAYDEN GULCH LOADOUT <br />TOPSOIL BALANCE <br />SUMMARY SHEET <br />Volume <br />CY (tons) <br />53,100 66,842 <br />SCRAPER FLEET COST <br />EQUIPMENT UNITS <br />SCRAPER 2 <br />14-G 0.25 <br />WATER TRK 0.25 <br />D10 DOZER 0.5 <br />TOTAL COST <br />1 See FPC Worksheets <br />Hours (1) <br />132 <br />CosVHour <br />$636.87 <br />TOTAL EQUIP. <br />& LABOR UNIT <br />COST <br />$239.97 <br />$89.50 <br />$141.63 <br />$198.29 <br />Total <br />$84,067 <br />TOTAL <br />COST <br />$479.94 /SCH HR <br />$22.38 /SCH HR <br />$35.41 /SCH HR <br />$99.15 /SCH HR <br />u <br />