Laserfiche WebLink
317_0 <br />• <br />Solenoid Va <br />Make-up Water Lme <br />Refus? (120 TPH, 25% Moisture, 1 19.9 GPM) <br /> <br />Note: At 400 tons per hour feed to the plant, 70.9 gpm of make-up water is needed. <br />~~a~ <br />~~~`d <br />REV sv DATE WYOMING Ft,JEL COMPANY <br />NEW ELK PREP PLANT <br />Las Animas Countv.Colorad <br />WATER FLOW SHEET <br />Elk R9ine Permit DAa <br />I PREPARED BY= SMagnuson Figure 4 <br />2.05-13 <br />DWN BY~SADa vi; DATE=12/1GBG <br />Water Tank <br />Iv~~and Water Line (25 GPPA) <br /> <br />