Laserfiche WebLink
TABLE OF CONTENTS <br /> <br />Introduction . <br />Inspection <br />Site Description . <br />Land Use. . <br />Embankment . . <br />Design Analysis. . <br />General <br />Hydrology . <br />SCS Curve Numbers and "k" Factor . <br />Precipitation and Storm Type . <br />Unit Hydrograph and Surface Condition. . <br />Time of Concentration. . <br />Sedimentology <br />Particle Size Distributions. . <br />Length - Slope Factors (L ,S) . <br />Control Practice Factor (CP) . <br />Storage Capacity. . <br />Spillway <br />Page <br />Pond No. 004 - East Ditch 11 <br />Remedial Compliance Plan 13 <br />Selected References. 15 <br />• Addendum A - 10-year, 24-hour SEDIMOT II (Input and Output) - 004 <br />Pond <br />Addendum B - 25-year, 24-hour SEDIMOT II (Input and Output) - 004 <br />Pond <br />Addendum C-100-year, 24-hour SEDIMOT II (Input and Output) - 004 <br />Pond <br />Addendum D- 10-year, 24-hour SEDIMOT II (input and Output) - 004 <br />Each Ditch <br />Appendix 1 - As-Built Report Sedimentation Structure 004 <br />• <br />