My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123757
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:27 PM
Creation date
11/25/2007 11:51:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH1 TAB 13 ATTACHMENT D SEDIMENTATION POND 004
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REMEDIAL COMPLIANCE PLAN <br />The present storage capacity and spillway configuration of Sediment Pond <br />No. 004 are inadequate. As a result of this, Peabody proposes the <br />following remedial actions be taken pending CMLRD approval: <br />1. Excavate the ponding area to provide the storage capacity <br />shown in Table 6. <br />2. Construction of the principal and emergency spillways as shown <br />on Exhibit 13-14. <br />3. Modify the embankment to provide for 3h:ly slopes on both the <br />upstream and downstream. <br />All material excavated from the ponding area and adjacent areas as a <br />result of the abdve remedial action, will be placed in one of the <br />following locations as determined by Peabody's field engineer during <br />constructi on: <br />i. The material will be tested for suitability as a plant growth <br /> medium, and, if suitable, be placed in an appropriate topsoil <br />• stockpile or direct hauled and used in a reclamation area. <br />2. If the engineer determines the material to be suitable for <br /> embankment material, the material will be placed and compacted <br /> within the 3:1 slopes of the embankment. <br />3. If the material is excessive or not suitable for use within <br /> the 3:1 slopes of the embankment, the material will be placed <br /> outside the plane of the 3:1 slopes on the downstream side of <br /> the embankment, graded into the surrounding topography, and <br /> reclaimed in accordance with Peabody's reclamation plan. This <br /> excessive material will increase the stability of the <br /> embankment by increasing the overall width, flattening the <br /> downstream slopes, and/or reducing the downstream embankment <br /> height. In addition, this material is in close proximity of <br /> the ponding area when final reclamation of the pond is <br /> required. Based on the field conditions encountered at the <br /> time of construction, the field engineer is allowed enough <br />• flexibility to dispose of the material in an acceptable <br />manner. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.