Laserfiche WebLink
6.4.12 Exhibit L -Reclamation Costs <br />A significant amount of the reclamation will occur concurrently with mining and <br />therefore that portion of earthmoving has not been included in calculation of the <br />bond amount. There will be no more than 100,000 yd3 of overburden and topsoil <br />stockpiled at any given time <br />MAXIMUM OF 75,000 yd3 STOCKPILED <br />TASK LIST DIRECT COSTS <br /> <br />NO. <br />TASK DESCRIPTION <br />TASK HOURS DIRECT <br />COST <br /> <br /> <br />001 Backfill Cell 2 and Cell 3 with fill from South of <br />Existing Pond Approximately 200,000 yd3 @$0.50 <br />er d3 <br /> <br />na <br /> <br />$100,000.00 <br />002 Backfillin 8 Slo a Gradin 0.5:1 TO 3:1 94,307 d3 89 $10,625.00 <br />006 To soil re lacement; 42,865 c $0.58/ d3 NA $24,861.00 <br />007 De-waterin filled it NA $2,262.00 <br />009 Re-ve elate Surroundin 64 acres $236/ac NA $15,104.00 <br />010 Mobilization! Demob.of Reclamation E ui ment NA $1,000.00 <br />TOTAL DIRECT COST <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />Liability insurance @ 1.55% of direct costs $2,385 <br />Performance bond @ 1.05% of direct costs $1,615 <br />Job superintendent costs, 5.5 hrs @ $33.88/hr $186 <br />Profit @ 10% of direct costs $15,385 <br />TOTAL O&P = $19,571 <br />CONTRACT AMOUNT (direct+O&P) _ $173,423 <br />PROJECT MANAGEMENT <br />Engineering work and/or contracUbid preparation @ 4.25% of cntr. $7,370 <br />Reclaimation management and/or administration C~ 5% of Intr. $8.671 <br />TOTAL INDIRECT COST = $35,613 <br />TOTAL BOND AMOUNT = $189,465 <br />Turnpike Mining Resource <br />Regular 112 application <br />