My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123687
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123687
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:24 PM
Creation date
11/25/2007 11:46:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X199421400
IBM Index Class Name
Permit File
Doc Date
11/14/1994
Doc Name
LEGAL DESCRIPTION & Stipulations
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ID: NOV 14'94 14:18 No .006 P.03 <br />• <br />STIPULATIONS <br />At the time of permit issuance (October 31, 1994), the following exploration boreholes are fully <br />approved for drilling subject to the stipulations below: PEDS-1, PEDS-2, PEDS-3, PEDS-9, and <br />PEDS-10. <br />1) A 1 /4 mile buffer zone shall be m.:intained between drill sites and the Yampa River <br />and all raptor nests during the wi.:ter and spring months. <br />2) Discharge of water from artesian :,oreholes may proceed only after the Division <br />has received a copy of the Conatr,~ction Dewatering Permit to be issued by CHOH. <br />If artesian flow is encountered in :: borehole prior to the issuance of the <br />Construction Dewatering Permit, ',hen a) the hole must be capped to prevent <br />discharge until the Construction Cawatering Permit is issued, or b) the water must <br />be discharged to a storage tank c; vac truck until the Construction Dewatering <br />Permit is issued. <br />3) All conditions stipulated in all lea:~as, agreements, clearances and associated <br />permits issued by the BLM, CDOF:, CDOW, USFWS and landowners must be <br />edharod to. <br />The remaining boreholes proposed under the N01 are subject to the above stipulations as well as <br />the stipulations outlined below: <br />4) Site preparation and drilling of an~r particular borehole may commence only after <br />the Division has received a copy cf the cultural resources clearance for that <br />particular site from the BLM. Any conditions set forth in the cultural resources <br />must be complied with. <br />5) Site preparation and drilling of am/ particular borehole may commence only after <br />the Division has received a copy of the threatened and endangered species <br />clearance for that particular site foam CDOW and USFWS. Any conditions set <br />forth in the threatened and endar.~ered species clearances must be complied with. <br />6) Site preparation end drilling of em/ particular borehole may commence only after <br />the Division has received a copy cf the signed BLM lease which permits <br />exploration activities for that part.cular hole. Any conditions set forth in the BLM <br />lease must be complied with. <br />7j Site preparation and drilling of en~ particular borehole may commence only after <br />the Division has received a copy of the signed landowner agreement for that <br />particular site. Any conditions sErforth in the landowner agreements must be <br />complied with. <br />
The URL can be used to link to this page
Your browser does not support the video tag.