Laserfiche WebLink
12/12/94 16:30 <br />•$303 291 7374 WILDLIFE-CENTRAL <br />STATE OF COLORADO <br />Roy Romer, Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WILDLIFE <br />AN EWAL OPPOFfNNfrV EMRAYEN <br />Perry D. Olson, Diredor <br />60s0 Broadway <br />Denver, Cotaarb 8021 s <br />Telephone: (3031 297-1192 <br />December 12, 1994 <br />Carl Mount <br />Division of Minerals & Geology <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />RE: Cooley Gravel Company -Dahlia North Resources Pit -File ArM-94-093 <br />Deaz Carl: <br />002/004 <br />For Wildlife- <br />For People <br />District Wildlife Manager Larry Gazcia and myself have visited this project location, and we <br />commented in detail on this proposal eazlier, as included with the application. <br />These comments will follow the format of those in our earlier letter to the applicant. <br />Buffer Along the South Platte River -Because most of the property proposed for mining is <br />disturbed cropland already, mining the central portion of the site will not have much effect on <br />wildlife. However, the South Platte River corridor is very important to a variety of wildlife and <br />the large atea of riparian vegetation at the northwest corner of the. property is a key area for <br />streamside habitat protection, Out original recommendation was that mining disturbance be kept <br />back 400' from the river in this azea, even though the stand of trees extends out to about 600'. <br />An alternative suggestion was to allow mining disturbance up to 250' from the stream bank with <br />extensive mitigation measums (togsoiling and planCngs) as described in our original letter. The <br />current mining plan proposes to mine up to within 150' of the rivers edge, and in a n, a <br />large berm would be built on the stream bank which would remove even more streamside <br />vegetation. This plan as proposed would almost completely destroy this lazge island of riparian <br />habitat with only minima! tree and shrub planting proposed as mitigation. We strongly support <br />our earlier suggestions for reducing impacu to this corner of the property and would be willing. <br />to discuss them in more detail with your staff and the applicant. <br />Along the west edge of the property, we fcel that the applicant's plan is reasonable. The <br />construction of a larger berm than currently exists here will destroy a good number of <br />cottonwood trees which aze growing on the current berm. We feel that these should be replaced <br />through replanting on the new berm or nearby. <br />• <br />DEPARTMENT OF NATURAL RESOURCES, James S. Lochhead, Executive Director <br />WILDLIFE COMMISSION, Thomas M. Eve, Chalnnan • Louls F. Swltt, ViceChelrman • Amdtl Salazar, Secretary <br />Jesse Langston Boyd, Jr., Member • Rebecca L. Fronk, Member <br />William R. Hogberg, Member • Mark LeVaffey, Member <br />