My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123617
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:20 PM
Creation date
11/25/2007 11:43:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005080
IBM Index Class Name
Permit File
Doc Date
9/29/2006
Doc Name
SR Request
From
DRMS
To
Environmental Alternatives Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatin Software <br />PROJECT IDENTIFICATION <br /> Permit/job# : M-20 05-080 <br />Task # : 003 State :Colorado <br /> rk <br />P <br />t Abbreviation :none <br />Date : 04/19/2006 a <br />Coun <br />y : <br /> Allen Pit <br />Sit Filename :M080-003 <br />User : KAP e : <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :New <br />Task description :Glade OVeCbUlden and tOp5011 <br />HOURLY EQUIPMENT COST <br />Basic machine : <br />Cat DSR Series 11 - SSU <br />Horsepower : <br />310 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $53.92 NA <br /> Operating cosUhour : $75.29 100 <br /> Ripper op. cosUhour : $2.39 30 <br /> Operator cosUhour : $32.53 NA <br /> Total unitcosUhour : $164.14 Total fleetcost/hour. $164.14 <br /> <br />MATERIAL QUANTITIES <br /> Swell Loose <br />Initial <br />068 CCY factor <br />23 : 1.215 volume : <br />028 <br />28, <br />LCv <br />, <br />volume : <br />urce of estimated volume :Reclamation <br />S Plan Map <br />o <br />Source of estimated swell factor :Top Soil , , ; <br />~~ ~ Job Condition Correction Factors ~ Source <br />HOURLY PRODUCTION <br />Operator skill : <br />0.75 <br />(avg.) <br /> t <br />f Material consistency : 1.00 <br />Cat HB <br />Average push distance : ee <br />175 1 <br />00 (gen <br />) <br /> LCY/hr Dozing method : . . <br />Unadjusted hourly production : 562.2 (avg <br />) <br /> Visibility : 1.00 . <br /> Job efficiency : 0.83 (1 shiH/day <br />Material consistency description : Spoil pile : D.80 (fnd-rf) <br />Consolidated stockpile <br />Push gradient : <br />1.22 Cat HB <br />( ) <br /> ° <br />(ne <br />) <br />/ Altitude : 1.00 (Cat HB) <br />Average push gradient : g <br />° <br />10.00 1 <br />44 (Cat HB) <br /> t <br />f Material weight : . <br />Average site altitude : ee <br />9,660 1 <br />00 (S/SU/U) <br /> Blade type : . <br /> 600 Ibs/LCY Net correction : 0.88 <br />Material weight : 1, <br />Weight description <br />Adjusted unit production : <br />493.02 <br />LCY/hr <br />Top Soil Adjusted fleet production : 493.02 LCYIhr <br />JOB TIME AND COST <br /> <br />1 Dozers) <br />Total ob time : <br />J <br />56.85 <br />Hours <br />Fleet size : <br />Unit cost : $0.333 /LCY Total Job cost : $9,331 <br />
The URL can be used to link to this page
Your browser does not support the video tag.