My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123607
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123607
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:20 PM
Creation date
11/25/2007 11:43:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
6/16/1997
Section_Exhibit Name
Application for Permit Renewal No. 4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> <br />• <br /> <br /> Location in Application <br />INFORMATION CATEGORY NARRATIVE MAPS <br /> M31 [o M35A, M52, <br />2.04.7(1) Ground Water Information 4-255 to 4-576u •HydrOlOgy x154-M54C <br /> 2.04.7(4) <br />2.04.7(2) Surface Water Information 2'402 to 2-454j, M,HydrOlOgy M51, M52 <br /> 2-525 co 2-530 2,04.7(4) <br />2.04.7(3) Alternative Water Supply Information 4-172 <br />2.04.8 Climatological Information z-z to 2-s3 <br />2.04.9 Soils Resource Information 2-1a2 co 2-34s •$oils M29 <br /> 2.04.9(1)(c) <br />2.04.10 Vegetation Information z-sa co z-1zz •Vegetation M16, M17 <br /> 2.O4.10(1)M18, M48 <br />2.04.11 Fish and Wildlife Resources Information 2-123 to 2-169 M21 to M26, M44 <br />2.04.12 Prime Farmland Investigation 2-336 [0 2-344 M29 <br />2.05.2 Operation Plan: Estimated Area for Life of 3-1 to 3-so M4 <br />Operation <br />2.05.3 Operation Plan: Permit Area 3-1 to 3-so •Operation Plan <br /> 2.05.3 M10A, M10B <br /> 3-9 to 3-lsa, <br />2.05.3111 Production Methods and E ui ment <br />4 P 3-22 to 3-36 <br />2.05.3(2) Operation Description 3-1 to 3-zl, M10A, ruoB <br /> 3-37 to 3-50 <br />2.05.313) Mine Facilities 3-159 to 3-194, M10A, M10B, M13A <br /> 4-173 to 4-198 M13B, M51, M57 <br />2.05.3(4) Ponds, Impoundments and Diversions 3-179 to 3-lao, ruoA, Mlos, M13A, <br /> 4-173 to 4-198 M51 <br /> <br />2.05.3(5) Topsoil )removal and storage) 3-19 to 3-21, <br />4-z45 co 4-263 M108, M56 <br />2.05.3(61 Overburden 3-9 to 3-15, <br />3-28 co 3-50 pllOA, M36 to M42 <br /> <br />2 <br />05 <br />3(71 Coal Handling Structures 3-160 to 3-170, M9 M10A <br />' <br />. <br />. 3-184 <br />2.05.3(8) Coal Processing Waste and Non-Coal NSA <br />Processing Waste <br />2.05.3(9) Underground Development Waste N/A <br />2.05.3(101 Return of Coal Processing Waste to MBA <br />Abandoned Workings <br /> <br />2.05.4 Reclamation Plan 3-1 to 3-194, <br />4-1 to 4-263 M10A, M10B, M46, <br />Annual Re ort <br /> <br />2.05.4(211a) Timetables 3-9 to 3-16, <br />3-7o to 3-Bo M10A, M10B <br />2.05.4(2)(b) Reclamation Cost Estimates 1-31 to 1-59a M6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.