Laserfiche WebLink
-~ <br />TYPE OR PRINT CLEARLY <br />14. Present load use Agricultural <br />(i.e., agricultural, industrial, etc.) <br />15. Proposed future laced use Reclaim back to pasture land <br />(Goal of reclamation) <br />INSTRUCTIONS: Thin application form must be submitted in duplicate and each form must <br />ba accompanied by the following information and items. The application <br />will not be processed until complete. See RULE 3 (for Limited Impact) <br />or RULE 4 (for Special 10-day) for additional guidance. <br />E7giIBIT A - Legal Description <br />The legal description moat identify the affected land and be wholly adequate-for <br />field location of the property. It can be in the form of metes and bounds survey <br />or a description by reference to township, range, and section to at least the <br />nearest quarter quarter section. Where applicable, the street address or lot <br />number(s) may be used. <br />E7tBIHIT H - ~tiniaa Place <br />This can be a general discussion of the methods, equipment, phases or stages of <br />the operation and those portions of land affected by each. Tha plan should be <br />closely correlated with the map and should show where extraction will begin, which <br />direction it will proceed. <br />E~IBIT C - Map <br />This map should be as comprehensive as possible in germs of clearly defining <br />the permit boundaries and indicating all roads or stoclcpile areas to be used in <br />connection with the operation. All immediately adjacent landowners must be shown. <br />The closest quarter section corner, section line, or any other locateable point <br />should also be shown on the map. <br />E7D3IBIT D - Wildlife, Water Resources, Vegetation and Soils Information <br />Each of the above-mentioned subjects must be addressed as outlined is the <br />applicable Rule, under item number ten (10). <br />E$RffiIT E - Reclamation Plan <br />As with the mining plan, this should be a general discussion of the methods, <br />equipment, phases or stages of the reclamation process and those portions of <br />load affected by each. If possible, the plan should ba closely correlated <br />with the map. If nod, the narrative must be comprehensive enough to draw an <br />accurate verbal picture of she expected physical appearance of the area after <br />completion of reclamation. <br />ERfiIBIT F - Proof of Local Government Approval <br />Thin must be a letter from the local government specifying conformance with <br />existing zoning regulations. <br />E~IBIT G - Source of Legal Right to Enter <br />This could be a copy of the lease, deed, abstract of title, or current tea <br />receipt. In lieu thereof, a statement acknowledged by a notary public that <br />the operator has the legal right to enter and mine will be accepted. <br />**FOR SPECIAL. 10-DAY PERMITS ONLY** <br />EILSIHIT H - Reclamation Coats <br />If the surety is requested to be less than $2500, the operator must submit <br />facts to support such request. Otherwise a surety of $2500 will automatically <br />be set. <br />ERHIHIT I - Terms of Governmental Contract <br />The operator must submit a copy of the contract or other proof that proves the <br />necessity of a special 10-day permit. The operator must also submit evidence <br />of the surety provided under the governmental contract, if it was required. <br />