Laserfiche WebLink
1 ~ <br />• • <br />i Exhibit LI <br />~I Reclamation Cost I <br />Cost of. reclamation are as follcnas: <br />Major disturbance <br />Re-distributing topsoil with dozer <br />R07 yds3/acre $50.00 __ <br />500 yds/dozer/dozerXhr dozer hr 581.00/ac~}e <br />2 acre in Fhase II $162.00 <br />15 acre in Phase II7 $1,215.00 <br />Smoothing topsoil with grader i <br />$50/hr X 1.29 shifts/acre X 10 hr shift = $6415.00/acre <br />• 2 <br />15 <br />Seedi <br />2 <br />15 <br />acre <br />acre <br />ncT at <br />acre <br />acre <br />in <br />in <br />$7_ <br />in <br />in <br />Phase II $1,290.00 <br />Phase IIi $9,675.00 <br />50.00/acre <br />Phase II $500.00 <br />Phase III $3,750.00 <br />Total cost; <br />Phase II $1,952.00 <br />Phase III $]A,64Q.00 <br />Suggested Rond; i <br />19R5-R6 Phase I None <br />1987-RS Phase II $.1,952.00 <br />1989-90 Phase III $]4,640.00 <br />Seeding will be done as we move from each Phase even in <br />the hisoric mine area. <br />r 1 <br />L.J <br />23 <br />i <br />