Laserfiche WebLink
RICHARD D. LAMM <br />Governor <br />~w ~~.~'p <br />III IIIIIIIIIIIII III <br />~ ! 6 ~` <br />OFFICE OF THE STATE ENGINEER <br />DIVISION OF WATER RESOURCES <br />JERIS A. DANIELSON <br />State Engineer <br />1313 Sherman Street-Room 616 SoJ1nO5a 4, " n. ~ ' ~~ ,;;, <br />Denver, Colorado 60203 jjUIS(91a k^IIY~YCiJ3J UN';1 4: ~. ~ ..I <br />(303)866-3581 <br />March 20, 1985 l,E~~ Y ~' ~t~~~ <br />~3I1R ~:"E <br />MF2fORADIDCPI <br />~: Philip C. Saletta, Mined Larxi Reclamat~i~on~ <br />FRCM: Hal D. Simpson, Deputy State Engineer /~.(/~ <br />SUBJECT: Penn. Mountain Mining, Inc., Bullger Basin Placer, FileNo. M-85-022 <br />As requested, we have reviewed the above mentioned application fod a gold <br />mining operation three miles southwest of Park City, Colorado, in Park <br />County. The applicant claims to require 43.73 acre-feet of water per year. <br />This requirement is to be met by a water right, Bullger Basin Di h, from <br />Pennsylvania Creek for 2.3 cfs. As long as Penn. Mountain Mining has a leyal <br />right to this water and operates in accordance with all applicabl water <br />statutes, we have no objections to the operator using this water., <br />HDS/JCM:ma/4458H <br />oc: Jim Clark, Div. Eng. <br />