Laserfiche WebLink
_ ~_ <br />EXHIBIT B MINING <br />CONSTRUCTION MATERIAL WILL BE REMOVED WITH FRONT-END LOADERS AND <br />DOZERS STARTING FROM THE SOUTHEAST SIDE AND WORKING TO THE NORTH- <br />EAST. TRANSPORTATION TO THE PROJECT AREA IS BY TRUCK AND UPON <br />DEMAND. <br />THERE WILL BE NO GROUNDWATER OR SURFACE WATER RIGHTS INVOLVED IN <br />THE OPERATION. NO WATER TABLE IS ANTICIPATED TO BE ENCOUNTERED <br />IN THE EXCAVATION. THERE WILL BE NO WATER REQUIRED FOR ANY ASPECT <br />~, OF THE OPERATION. <br />THE ACUTAL AREA TO BE MINED WILL COVER 2.5 ACRES, AS SHOWN ON THE <br />MAP. <br />THE TOTAL AFFECTED AREA WILL COVER NO MORE THAN 2.5 ACRES AS SHOWN <br />ON MAP. <br />TIMETABLE OF OPERATIONS: THE PROJECT WILL BE IN AN UNKNOWN AMOUNT <br />OF STAGES DEPENDING ON WHEN GROUND IS NEEDED FOR SURFACING ROADS <br />IN THE AREA. <br />THE MATERIAL TO BE MINED WILL BE SAND AND GRAVEL. <br />NO MORE THAN 70,000 TONS OF MATERIAL WILL BE MINED INCLUDING <br />OVERBURDEN. <br />THIS OPERATION DOES NOT INTERFERE WITH ANY OLD DREDGE TAILINGS. <br />THE RIVER IS APPROXIMATELY 200 FEET FROM THE SITE. <br />THIS SITE WILL BE USED AS A CRUSHING OPERATION, SOME PIT-RUN WILL <br />BE EXCAVATED ALSO. THE EXCAVATION WILL RUN FROM SE TO NW INTO <br />HILLSIDE WITH FINAL SLOPE TO BE GRADED AND SEEDED IN COOPERATION <br />~ WITH S.C.S. THIS PIT IS DRY AND WILL NOT AFFECT THE STREAM. DUST <br />i ABATEMENT WILL BE CONTROLLED BY HAULING WATER TO THE SITE. CRUSHER <br />OPERATIONS AT THIS PIT WILL PROBABLY COMMENCE IN 1982. <br />THE TOPSOIL BEING STOCKPILED NORTHEAST OF PIT NEXT TO ACCES ROAD. <br />WHEN WE HAVE COMPLETED THE MINING, A 3% GRADE GOING UP FROM THE <br />RIVER WILL BE LEFT. THIS SLOPE WILL START AT APPROXIMATELY 25 <br />FEET ABOVE THE RIVER. <br />