Laserfiche WebLink
' 'fie material balar+oe requirements ace sumsarized belay: <br />SClERSET MINE <br />Material ealanae Surmncy <br /> Voltme Comic Yards <br />Aces Fill C~ Balance <br />Hear Creek Pad - 8,590 8,200 - 390 <br />Bear Creek Culvert _~ ] "048 ]•.048 <br />Total - 8,590 9,248 658 <br />La+er Hubbard Creek Pad - 7,275 6,236 - 1,039 <br />Laver Aubbsrd Creek Culvert _~ ]..034 1.9.34 <br />Total - 7,275 7,270 - 5 <br />Upper Aubtard Creek Pad - 1,935 0 - 1,935 <br />Topsoil Pile _~_ 2..3.42 2..342 <br />Total - 1,935 2,302 367 <br />Elk Creek Yard * - 18,606 22,941 4,335 <br />Elk Creek Culvert 0 18,885 18,885 <br />Topsoil Required - 14.809 _9_ 1!1.$43 <br />~ Total <br />• 33,415 41,826 8,411 <br />* Note: Thia includ°a 4,056 cubic yards o£ topsoil aaterial. <br /> <br />