My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123469
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:13 PM
Creation date
11/25/2007 11:34:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
REGRADING PLAN SOMERSET MINE (OLD APPENDIX K)
Section_Exhibit Name
Exhibit 2.05-E5 Part 4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPEI~ffiX R <br /> <br />The regrading plan for the Somerset Mine is based on a balance between cut <br />and fill material for arses requiring reclamation. <br />'it:e following definitions or assunptians are used: <br />Cut - areas requiting re~aval to obtain the proposed post <br />mine topography. <br />Fill - arses requiring the addltion of material to obtain <br />the proposed poet nine topography. <br />Subaceas - individual areas along a cross section whirl: are <br />sinned up to obtain total cut or fill for that <br />cross section. <br />Net Cut - total of a:t subareas for a given cross section. <br />Net Fill - total aE fill subareas foc a given cross section. <br /> <br />Fill Aran - fill area in cross section obtained by multiplying <br />pla:rimetered square ind: by map scale. <br />Cut Area - cut arse an Cosa section obtained by multiplying <br />planineter square inch by map scale. <br />Distance - average distance between rose section assured to <br />be area of influence for a given cross section. <br />Volume Cubic <br />Yards - cut ar fill volune obtained by multiplying area <br />times distance divided by 27. <br />Balance - difference between a~ and fill for a specific <br />cross section. A negative balance indiostes fill <br />is rsluired while a positive bslanae indi~tes <br />additional cut material is available. <br />An example calculation is: <br />Map scale: horizontal 1' ~ 20 ft <br />vertical 1' ~ 20 ft <br />Net fill planimztered ~ .61 sq in <br />Distance between sections ~ 137 ft <br />Area ~ .61 sq in x 20 ft/in x 20 ft/in ~ 244 sq ft <br />Volume ~ 244 sq ft x 137 ft/27 cu ft/cu yd ~ 1,238 cu yds <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.