My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123428
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123428
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:12 PM
Creation date
11/25/2007 11:31:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044A
IBM Index Class Name
Permit File
Doc Date
3/31/2004
Doc Name
pages 2.05-1 through 2.05-66
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of I S fee[ above the portals will seal the portal entries. This sealing plan has been approved by MSHA. Backfilling <br />and covering of the coal seam was and will be accomplished through the use of front-end loaders, end dump trucks, <br />• bulldozers, and graders. The shop/office building, scrap-yard, and associated pad will remain intact until no longer <br />needed by RAG Empire. <br />Once the backfilling and covering of the coal seams is complete, the excavation would be available for waste disposal <br />consisting mainly of coarse reject material from the rotary breaker. Since the No. 9 excavation waste disposal area is <br />below ground disposal site, all the restrictions placed on the approved waste disposal site would not apply. However, <br />all disposal activities will conform to the approved MSHA plan. The approved MSHA plan will be submitted to the <br />CMLRD upon receipt. It is planned to place the waste material in the excavation in approximately two (2) foot lifts. <br />The operation of the front-end loaders, end-dump trucks, bulldozers, and graders will effectively compact the waste <br />material. Design details and cross-sections for the No. 9 Portal waste disposal site are presented on the No. 9 Portal - <br />Waste Disposal Site Map (Map 28). <br />Once the waste material has reached a height of approximately four (4) feet below the planned reclaimed surface, the <br />material will be covered with a minimum of four (4) feet of backfill material. Backfill material will be taken from the <br />material originally excavated from the No. 9 Portal site. Since a majority of the No. 9 Portal excavation will be back- <br />filled with coarse reject material, there will be an excess of material left from the original excavation. This excess <br />material will be used to cover the No. 9 portal pad area with a minimum of four (4) feet of material. <br />Please refer to the Reclamation Plan Map (Map 29) for the final post-mining topography of the No. 9 Portal azea. The <br />originally proposed post-mining land use (cropland) will be retained for the No. 4 portal area. <br />The final reclamation plans for the No. 9 Portal area are presented in Section 2.05.4, Reclamation Plan. <br />• Return of Coal Processing Waste to Underground Workings <br />No coal processing waste will be returned to underground mine workings at RAG EC, except that rock generated <br />during development work can be placed in rock rooms underground. This material does not leave the mine and sees <br />no processing. The use of rock rooms has been discussed previously. <br /> <br />~ppROVIEID an.R 1r, ~~tl? <br />MidTerm Response 2.05-22 ~(~'3'3 Revised 12/05/01 <br />