My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123402
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:10 PM
Creation date
11/25/2007 11:29:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m2004044
IBM Index Class Name
Permit File
Doc Date
11/24/2004
Doc Name
Application Revised Change Consideration Date
From
DMG
To
Tetra Tech RMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Page 57 <br />Construction Materials Rule 2 <br />2.9.2 Petition Submission <br />Petitions for reconsideration must be received by the Office within twenty (20) <br />calendaz days of the effective date of the Board's written decision. The <br />effective date.of the Board's decision is the date the Board Order is signed, or <br />such other date as may be stated in the Final Board Order. <br />2.9.3 Consideration of Petition <br />The Boazd may grant or deny the petition based solely on the written submittal, <br />or the Board may, in its discretion, grant the Petitioner an opportunity to <br />present oral arguments. . <br />2.9.4 Automatic Denial of Petition <br />T'he petition shall be deemed denied unless it is granted within sixty (60) days <br />of. receipt of the petition.. <br />2.9.5 TSme Limitations <br />'The timely filing of a petition for reconsideration shaIl toIl the time in which the <br />Parties to 'the hearing may seek judicial review of the Boazd's decision. ~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.