Laserfiche WebLink
./ • <br />J; <br />/a <br />-3- <br />How will the waste rock and fines be used in reclamation of the site? <br />What thickness of topsoil will be placed on the pit floor and bench <br />areas? <br />Exhibit E - Map <br />J 1. Please provide to scale a visible, locatable, and permanent reference <br />point on the map. This could be a survey corner, road intersection, <br />house or other building, or other structure which will help locate the <br />site. <br />Cl0 ~wnz15 <br />2. Please provide the names of all owners of record of the surface of the <br />affected area and of the land immediately adjacent to the affected area. <br />Financial Warranty <br />The maximum amount of financial warranty for a Limited Impact Operation is <br />55,000.00. If you wish to commit to a E5, 000.00 financial warranty, then you <br />do not need to provide an estimate of reclamation costs. If you want to post <br />a uncial warranty in a lesser amount, then you must provide an estimate of <br />the actual costs to reclaim the site based on what it would cost an <br />independent contractor to complete reclamation. This should include unit <br />costs for the following activities as appropriate to the operation: <br />backfilling, grading, topsoil application, seeding, mulching, fertilization, <br />and labor. <br />Thank you for contracting our office. If you have any question or need <br />assistance, please contact me. <br />cc: Ed Bischoff, Mineral Program Supervisor <br />/tmb <br />7987E <br />