COLORADO SAND AND GRAVEL —SANDY ACRES, 2nd AMENDED APPLICATION
<br />N
<br />III = 2001
<br />SEP 2 8 1987
<br />A PART
<br />OF
<br />THE
<br />NE
<br />1/4 OF
<br />THE
<br />SE 1/4, SECTION
<br />26
<br />AND A PART OF THE
<br />NW 1/4 OF
<br />THE
<br />SW
<br />1/41
<br />SECTION
<br />25,
<br />TI S., R67W., 6th
<br />P.M.,
<br />ADAMS COUNTY, COLORADO
<br />!..XIII9IT C-3, N!':]N( -;
<br />132nd AVE.
<br />I�
<br />B -4
<br />9.5 AC ±
<br />B -3
<br />II Ac. ±
<br />54\1\1 D'(
<br />AREA OF FUTURE LOCATION
<br />OF SCALE HOUSE B OFFICE
<br />2nd
<br />ENTRANCE
<br />B -I
<br />19 Ac. +
<br />I
<br />B -2 ,
<br />3 25 Ac.
<br />I� 470 00
<br />C
<br />C
<br />c
<br />n
<br />II c
<br />C
<br />I I �
<br />K
<br />I 470.00
<br />J_\(1, hI
<br />AREA OF ALLOWED TOPSOIL
<br />STORAGE FOR B- PHASES -
<br />AREA OF ALLOWED FUTURE TOPSOIL
<br />STORAGE FOR B- PHASES
<br />EXISTING 72 BARBED WIRE /CHAIN LINK
<br />EXISTING 8
<br />FUTURE TOPSOIL
<br />STORAGE
<br />AREA
<br />FOR A 8 B
<br />PHASES
<br />EXISTING I TOPSOIL
<br />1! STORAGE AREA FOR A- PHASES
<br />3.5 Ac. ±
<br />A -3
<br />2.5 Ac. ±
<br />TOPSOIL
<br />STORAGE FOR
<br />A - PHASES /
<br />I' I (\J1 1= \A /0OI)
<br />A -1
<br />22 Ac.±
<br />I IAI I
<br />INTERMITENT TOPSOIL —
<br />STORAGE FOR A- PHASES
<br />n�Iioivlw EN61M[[RIM6 /6UIIV EYING
<br />)E SCRIPTION t11IYIAL9
<br />86 -70
<br />QUEST CONSULTING INC
<br />J
<br />DENVER, COLORADO 00221
<br />(303) 426 -8436
<br />IAMN 6Y, 6..4
<br />'PRUVEU- R A/ F.
<br />G A 5- 26 -'87
<br />N
<br />698.96
<br />J
<br />0�
<br />P
<br />O
<br />h
<br />Co
<br />N
<br />WATER LINE
<br />TOPSOIL MINIMUMS IO FENCE
<br />AREA TO BE FILLED W /SPOILS a CLEAN
<br />/FILL /
<br />WATER LINE
<br />AREA WHICH MAY
<br />BACK XFILLED W /SPOILS
<br />9 CLEAN FILL
<br />TYPICAL CROSS SECTION, B- PHASES
<br />NTS.
<br />7lit i-
<br />J �PJ 0PG v
<br />,e
<br />PJ.40 �O
<br />i —FENCE
<br />9° TOPSOIL AVERAGE
<br />TYPICAL CROSS SECTION, A- PHASES
<br />N T. S .
<br />Mining Notes:
<br />1. All mining areas shall be enclosed by a 72" chain link fence
<br />with 3 strands of barb wire.
<br />2. Sloping - For area proposed for a permanent lake, temporary
<br />vertical slopes may be employed provided that final slopes
<br />are constructed to 3 to 1 slopes to 10' below water line,
<br />then 2 to 1 to the depth of the lake. The floor of the pit
<br />will be left in a reasonably smooth condition.
<br />3. Adams County Approval - County Case Number 120 -A5 C. An
<br />amended application is also being processed through Adams
<br />County.
<br />4. Mining may come up to within 10' of property line as per
<br />original Adams County approval - "No excavation or processing
<br />of sand and gravel shall be permitted within 10' to adjacent
<br />property, easement, or irrigation ditch or right -of- way ".
<br />S. A11 areas shall be maintained in such a manner as to prevent
<br />soil erosion, fugitive dust, and growth of noxious weeds.
<br />A 1 1 internal haul roads shall be kept in a dust free
<br />condition.
<br />b. The portable crusher, wash plant, other equipment,
<br />intermittent haul roads, and material stockpiles may be moved
<br />throughout the permit area in order to accommodate mining
<br />and /or reclamation. However, such uses may not take place
<br />over any topsoil storage. I —
<br />7. Mining shall take place in accordance with these plans, with
<br />previous and /or future Adams County and MLRB approvals, and
<br />be in conformance with applicable State and County
<br />regulations regarding mining.
<br />8. Hours of Operation - Except for emergencies and equipment
<br />maintenance, 6:00 AM to 6:00 PM, Monday thru Saturday.
<br />9. San -o -lets and bottled water will be employed for water and
<br />sanitation during mining and rehabilitation.
<br />10. Primary haul route to Nome Street then south to U.S. 85.
<br />SCANNED
<br />I I�IIII ��lll �IIII ��III II�II �I�II I�I�I �II�I ���� III
<br />00014453
<br />A -2
<br />8.5 Ac.+
<br />—
<br />II
<br />SCALE
<br />HOUSE
<br />B
<br />OFFICE
<br />I
<br />I
<br />I
<br />ENTRANCE
<br />A -3
<br />2.5 Ac. ±
<br />TOPSOIL
<br />STORAGE FOR
<br />A - PHASES /
<br />I' I (\J1 1= \A /0OI)
<br />A -1
<br />22 Ac.±
<br />I IAI I
<br />INTERMITENT TOPSOIL —
<br />STORAGE FOR A- PHASES
<br />n�Iioivlw EN61M[[RIM6 /6UIIV EYING
<br />)E SCRIPTION t11IYIAL9
<br />86 -70
<br />QUEST CONSULTING INC
<br />J
<br />DENVER, COLORADO 00221
<br />(303) 426 -8436
<br />IAMN 6Y, 6..4
<br />'PRUVEU- R A/ F.
<br />G A 5- 26 -'87
<br />N
<br />698.96
<br />J
<br />0�
<br />P
<br />O
<br />h
<br />Co
<br />N
<br />WATER LINE
<br />TOPSOIL MINIMUMS IO FENCE
<br />AREA TO BE FILLED W /SPOILS a CLEAN
<br />/FILL /
<br />WATER LINE
<br />AREA WHICH MAY
<br />BACK XFILLED W /SPOILS
<br />9 CLEAN FILL
<br />TYPICAL CROSS SECTION, B- PHASES
<br />NTS.
<br />7lit i-
<br />J �PJ 0PG v
<br />,e
<br />PJ.40 �O
<br />i —FENCE
<br />9° TOPSOIL AVERAGE
<br />TYPICAL CROSS SECTION, A- PHASES
<br />N T. S .
<br />Mining Notes:
<br />1. All mining areas shall be enclosed by a 72" chain link fence
<br />with 3 strands of barb wire.
<br />2. Sloping - For area proposed for a permanent lake, temporary
<br />vertical slopes may be employed provided that final slopes
<br />are constructed to 3 to 1 slopes to 10' below water line,
<br />then 2 to 1 to the depth of the lake. The floor of the pit
<br />will be left in a reasonably smooth condition.
<br />3. Adams County Approval - County Case Number 120 -A5 C. An
<br />amended application is also being processed through Adams
<br />County.
<br />4. Mining may come up to within 10' of property line as per
<br />original Adams County approval - "No excavation or processing
<br />of sand and gravel shall be permitted within 10' to adjacent
<br />property, easement, or irrigation ditch or right -of- way ".
<br />S. A11 areas shall be maintained in such a manner as to prevent
<br />soil erosion, fugitive dust, and growth of noxious weeds.
<br />A 1 1 internal haul roads shall be kept in a dust free
<br />condition.
<br />b. The portable crusher, wash plant, other equipment,
<br />intermittent haul roads, and material stockpiles may be moved
<br />throughout the permit area in order to accommodate mining
<br />and /or reclamation. However, such uses may not take place
<br />over any topsoil storage. I —
<br />7. Mining shall take place in accordance with these plans, with
<br />previous and /or future Adams County and MLRB approvals, and
<br />be in conformance with applicable State and County
<br />regulations regarding mining.
<br />8. Hours of Operation - Except for emergencies and equipment
<br />maintenance, 6:00 AM to 6:00 PM, Monday thru Saturday.
<br />9. San -o -lets and bottled water will be employed for water and
<br />sanitation during mining and rehabilitation.
<br />10. Primary haul route to Nome Street then south to U.S. 85.