Laserfiche WebLink
~ • iii iiiiiiiiuiuiii <br />• 899 <br />EXHIBIT D - RECLAMATION PLAN <br />5. Tne waste rock and tailings wili be tncoroorated into the <br />reclamation areas of the pit, solo for rip ra0 for iake <br />shores, or used for work decks for future building site. Tne <br />area will be seeded into pasture until a buildirg site would <br />be needed. There shoula be no hyarologic disturpance or off <br />site water damage as the work Deck is porous and absorbs all <br />run-off. <br />6. Reclamatior. costs: <br />Tne operator will use their own equipment for the re:.lamation. <br />Tne-efore the only costs will be tnose for fuel, seee. giant. <br />and fertilizing material. <br />These costs are on a per acre basis as follows: <br />Graoing - 3 hours Der acre @ $75.00 per acre $ 225.00 <br />Fertilizer - 40 lbs. nitrogen 8 40 lbs. <br />bhosphorus/acre @ $20.50/acre 20.50 <br />Straw mulch - 2 ton/acre @ $60.00/ton 120.00 <br />Trees - 1 gallon size @ 6/acre <br />Ponderosa Pine @ $8.00 each 48.00 <br />Rocky Mountain Juniper @ $8.00 each 48.00 <br />Grass - seed costs: <br />Syecies Variety Rat e, acre rr Cost_ Total <br />Western Wheat Rosana 8 4U $4/lb. $1.00 <br />Sideoats Grama Vaughn 4.5 9 $5/1'0. 45.00 <br />Blue Grama Covington 1.5 1.5 $611b. 9.00 <br />Biq Bluest em Kaw 5.5 5.5 $4~1b. 2Z.N <br />Yellow Indian Lland. 5 5 $5/lb. 25.00 <br /> Holt. Chevenne S.`~6t.00 <br /> Sub-total $ 722.50 <br /> Contingencv @ 1~.8~ 114.50 <br /> TOTAL r-.~ ACP.E g 837.00 <br />5.0 active acres ~ $83i.00iac re = Bond $4 _185_00 <br />Reciar :ion costs on previous amendment were 43.25 acres at <br />g50 ~JG.00, or $1,156.00/acre = X5,780.00. <br />2 <br />