Laserfiche WebLink
COLOWYO COAL COMPANY <br />1991 PERMIT APPLICATION <br />BONDING COST ESTIMATE WORKSHEET <br />SITE SPECIFIC DOZER GRADING PRODUCTION <br />Area Description <br />Dozer Ripped Rock Blasted Rock Specific <br />Production Correction Correction Correction <br />(Lcy/hr.) Factor Factor Factor <br />Adjusted <br />Production <br />Rate <br />~Y/hr.) <br />Pond Reclamation Summarv <br />Streeter Fill Pond <br />Work Area Pond <br />Gossard Pond <br />Gossard Loop Pond <br />Stocker Pond <br />Gulch A Pond <br />Taylor Pond <br />Prospect Pond <br />West Pit Pond <br />Sewage and Aeration Ponds <br />Washbay Pond <br />Washbay Sediment Sump <br />Tavlor Creek Scoria Pit Summarv <br />Scoria Pit <br />1,650 0.47 776 <br />925 0.47 435 <br />1,650 0.47 776 <br />1,650 0.47 776 <br />1,650 0.47 776 <br />1,200 0.47 564 <br />925 0.47 435 <br />1,650 0.47 775 <br />1,200 0.47 564 <br />1,200 0.47 564 <br />925 0.47 435 <br />1,200 0.47 564 <br />1,550 0.77 1,271 <br />B-46 Dr ~ Z o° 3 <br />