Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />215 State :Colorado PermiUjob # : C-98-083 <br />12/09/2003 <br />JRS <br />Permit or other job action :Technical Revision 30 <br />Task description :Replace Topsoil from Stockpile to Gob Pile #2 <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br />Scraper work team -Scraper :Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area :NA <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />Cost Bre <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrapeR NA NA NA NA NA <br />Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownerhip cost/hour : $75.83 NA NA NA NA NA <br />Operating cost/hour : $165.89 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cosUhour : $25.43 NA NA NA NA NA <br />Unit subtotals : $267.15 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $534.31 Support : $0.00 Maintenance : $0.00 <br />Total work team cost hour : $534.31 <br />- .:: - ., <br />. ...: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 55,000 CCY factor : 1.125 volume : 61,875 LCY <br />Source of quantity take-off :Appendix A <br />Source of estimated swell factor :CAT Handbook <br />Abbreviation :none <br />Filename : C083-215 <br />