Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 211 <br />Date : 1 2/0 92 0 03 <br />User: JRS <br />Permitfob# : C-96-083 <br />Abbreviation :none <br />Filename : C083-211 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Technical Revision 30 <br />Task description :Spread Uncompacted Refuse on Gob Pile #2 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br /> <br />Ownership cosuhour <br />Operating cosuhour <br />Ripper op.cosUhour <br />Operator cosuhour <br />Total unit cosuhour <br />MATERIAL QUAN7171E$ <br />Initial <br />volume : 200,000 LCY <br />Swell <br />factor <br />LCY <br />'.47 <br />Source of estimated volume :Page 2.05.45 <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 5.00 % (I <br />Average site altitude : 6,100 feet <br />Material weight : 2,000 Ibs/LCY <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />JOB TIME AND COST <br />Fleet size : 4 Dozers) <br />Unit cost : $0.326 /LCY <br />Utilization <br />$51.07 NA <br />$93.97 100 <br />$0.00 0 <br />$31.83 NA <br />$176.87 Totalfleetcosuho <br />Loose <br />NA volume : 200,000 <br /> <br /> <br /> <br /> <br /> ur <br />Operator skill : 0.75 (au; <br />Material consistency : 1.20 (Cat <br />Dozing method : 1.00 (ge <br />Visibility : 1.00 (av; <br />Job efficiency : 0.83 (lshifl <br />Spoil pile : 1.00 (doz <br />Push gradient : 0.90 (Cat <br />Altitude : 1.00 (Cat <br />Material weight : 1.15 (us <br />Blade type : 1.00 (S/SI <br />Net correction : 0.78 <br /> <br />Adjusted unit production : 543.14 LCY/hr <br />Adjusted fleet production : 2,172.57 LCY/hr <br />Total job time : 92.08 Hours <br />Total job cost : $85,127 <br />Horsepower: 405 <br />Shift basis : 1 perday <br />Data source : (CRG) <br />