Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 219 <br />Date : 1?J09/2003 <br />User : JRS <br />Permitfjot# : C-96-083 <br />Abbreviation :none <br />Filename : C083-219 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Technical Revision 30 <br />Task description :Replace Topsoil from Stockpile fo Pond F <br />HOURLY EQUIPMENT COST <br />Basic machine : <br />Cat D9R - 9SU <br />Horsepower : <br />405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 : 3-shank ripper <br /> Data source : (CRC) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.07 NA <br />Operating cosUhour : $93.97 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $31.83 NA <br />Total unit cosUhour : $176.87 Total fleet cosUhour . $176.87 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,000 CCY factor : 1.125 volume : 1,125 LCY <br />Source of estimated volume : Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 300 feet <br />Unadjusted hourly production : 437.8 LCY/hr <br />Material consistency description <br />Cnncolidated stockpile <br />Average push gradient : 0.00 % (f <br />Average site altitude : 6,100 feet <br />Material weight <br />Weight description <br />Earth - Drv Packed <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />2,550 Ibs/LCY <br />Job Condition Correction Factors <br />Operator skill : <br />0.75 ource <br />(avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (av9~) <br />Job efficiency : 0.83 (1shiR/da} <br />Spoil pile : 0.80 (fnd-riJ <br />Push gradient : 1.00 (Cat HB) <br />ARitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SUAI; <br />Net correction : 0.45 <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.900 /LCY <br />Adjusted unit production : 196.58 LCY/hr <br />Adjusted fleet production : 196.58 LCY/hr <br />Total job time : S.T2 Hours <br />Total job cost : $1,012 <br />