Laserfiche WebLink
(8) Measure water conductivity, PH, temperature, and depth. Have full suite laboratory analysis using the <br />Ground Water Parameters on following list (February, May, August, and November) <br />(g) Monitoring of all groundwater wells and spoil springs in New Horizon 1 Mine, and wells GW-N16P1, <br />GW-N17P1, GW-N18P1, GW-N36, GW-N37 and GW-N38 in New Horizon Mine has been discontinued <br />• as per DMG's approval of TR38. Monitoring of these wells will resume when WFC applies for Phase 3 <br />bond release in order to collect data to fullfill DMG's requirement. When monitoring resumes for Phase <br />3 purposes, then procedure Field(9) will change to Field(6) parameters. <br />(10) Monitoring of all groundwater wells and spoil springs in New Horizon 1 Mine, and wells GW-N16P1, <br />GW-N17P1, GW-N18P1, GW-N36, GW-N37 and GW-N38 in New Horizon Mine has been discontinued <br />as per DMG's approval of TR38. Monitoring of these wells will resume when WFC applies for Phase 3 <br />bond release in order to collect data to fullfill DMG's requirement. When monitoring resumes for Phase <br />3 purposes, then procedure Lab(10) will change to Lab(5) parameters. February and August for Semi- <br />Annual schedule and August for Annual schedule. <br />(11) Monitoring of all groundwater wells and spoil springs in New Horizon 1 Mine, and wells GW-N16P1, <br />GW-N17P1, GW-N18P1, GW-N36, GW-N37 and GW-N38 in New Horizon Mine has been discontinued <br />as per DMG's approval of TR38. Monitoring of these wells will resume when WFC applies for Phase 3 <br />bond release in order to collect data to fullfill DMG's requirement. When monitoring resumes for Phase <br />3 purposes, then procedure Field(11) will change to Field(7) parameters. August for Annual schedule. <br />• <br />C~ <br />I P.EVISED 12-17-98) <br />