Laserfiche WebLink
;. ~: <br />~ III IIIIIIIIIIIIIIII ~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 5[., Room 215 <br />Denver, Colorado 80?03 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MI NING•BAFETY <br />August 23, 2001 Bill Owens <br />Governor <br />Mr. Wallace F. Burtis Greg E. Walther <br />Executive Director <br />Wallace F. Burtis <br />Michael B. Long <br />66 DartmOUth Ave. Dw~sion DireUOr <br />Pueblo, CO 81005 <br />Re: Florence Pit, M-2001-070, Permit Issuance -Hard Rock Mining Operation <br />Dear Mr. Burtis: <br />On August 23, 2001 the Division of Minerals and Geology found Wallace F. Burtis to have satisfied the <br />applicable requirements of C.R.S. 34-32-101 et sec .for obtaining a mining and reclamation permit. Therefore, a <br />permit is being issued. Two signed originals of the permit have been executed. We have kept one copy for our <br />files and are enclosing one copy for your use. It is your responsibility to wmply with all of the teens of the <br />permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of all of <br />these materials; therefore, Done have been enclosed with this mailing. We suggest that you keep a copy of the <br />permit and the permit application at the mining operation as a reference for operating personnel, to help ensure <br />compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Hard Rock/Metal Mining Rules and Regulations <br />and/or contacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, August 23rd, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $225.00. Please cousuh the Act, Rules and Regulations, and your <br />permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please contact the Division. <br />Sincerely, <br />Ivhchael B. L <br />Division Director <br />MBL/ALA/bdc <br />Enclosure <br />