Laserfiche WebLink
_ii T-rl~~l ~~f_'l.'Z V- <br />I <br />r- ;.:c.t?c.-el ~~_°e r.:a tlcn t:~e <br />a??lic=r.t :-~y :+_'sh to s~~.~ai t. <br />O1 General Provisions <br />4.02 Signs and Markers <br />4.03 Roads <br />4.04 Support Facilities <br />4.05 Hydrologic Balance <br />4.06 Topsoil <br />4.07 Sealing of Drilled Holes & Underground <br />Openings <br />4.08 Use of Explosives <br />4.09 Disposal of Excess Spoil and Under- <br />ground Development Waste <br />4.10 Coal Processing Waste Banks <br />4.11 Coal Processing Waste <br />4.12 Slides and Other Damage <br />4.13 Contemporaneous Reclamation <br />4.14 Backfilling and Grading <br />4.15 Revegetation Requirements <br />4.16 Postmining Land Use <br />4.17 Air Resources Protection <br />4.18 Protection of Fish, Wildlife, and <br />Related Environmental Values <br />4.19 Protection of Underground Mining <br />20 Subsidence Control <br />21 Coal Exploration <br />4.22 Concurrent Surface & Underground Mining Pg <br />4.23 Auger Mining <br />4.24 Operations in Alluvial Valley Floors <br />4.25 Operations On Prime Farmland <br />4.26 Mountaintop Removal <br />4.27 Operations on Steep Slopes <br />4.28 Coal Processing Plants and Support <br />Facilities Not Located at or Near <br />the Mine Site or Not Within the <br />Permit Area <br />4.29 In Situ Processing <br />4.30 Cessation of Operations <br /> <br />Pg. 4.01-1 <br />Pg. 4.02-1 <br />Pg. 4.03-1 <br />Pg. 4.04-1 <br />Pg. 4.05-1 <br />Pg. 4.06-1 <br />Pg. 4.07-1 <br />Pg. 4.08-1 <br />Pg. 4.09-1 <br />Pg. 4.10-1 <br />Pg. 4.11-1 <br />Pg. 4.12-1 <br />Pg. 4.13-1 <br />Pg. 4.14-1 <br />Pq. 4.15-1 <br />. 4.16-1 <br />. 4.17-1 <br />g. 4.18-1 <br />g. 4.19-1 <br />g. 4.20-1 <br />4.21-1 <br />4.22-1 <br />4.23-1 <br />4.24-1 <br />4.25-1 <br />4.26-1 <br />4.27-1 <br />g. 4.28-1 <br />g. 4.29-1 <br />g. 4.30-1 <br />Surface Ownership (Map 1) <br />Coal Ownership (Map 2) <br />Vegetation (Map 3) <br />Soils (Map 4) <br />Regional Geology (Map 5) <br />Regional Hydrology (Map 6) <br />geology/Hydrology (Map 7) <br />Seologic Cross Sections (Map <br />'re-Mining and Post-Mining <br />Land Use (Map 9) <br />'re-Mining Topography (Map 10; <br />line Plan (Map 11) <br />line Facilities (Map 12) <br />:oad Design (Map 13) <br />'ost-Mining Topography (Map 1~ <br />'re-Mining and Post-Mining <br />Cross Sections (Map 15) <br />;o the ~est of nu .c~cwiedye, ~a11 t.`.e ?n_°or...at!on ?resented in t.5is a: ol'cat_on is ~=1e <br />and cor=ect. PEERLESS RESOURCES, INC.n <br />// <br />/ ~ ( <br />• ,.. <br />L. Dale Larsen <br />T=^tG President <br />(Si cnatcre by :nd_v±dual le:al?u au~-or:zed =o <br />bind t:.e oceretor to this a~olicat'on) <br />-3- <br />