Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />-'t <br />,~ <br />Project: Pond E Relocation <br />Location: Foidel Creek Mine <br />Client: Precision Excavating <br />Work Performed: <br />Project No.: 95-2505 <br />Report No.: 6 <br />Date: 10/30/95 <br />Time: 1.5 <br />Mileage: 15 <br />EngrJTech: Ti <br />As requested. we visited the project site on this date and conducted nuclear density test No.'s 20 through 22 on <br />the material being placed. <br />The excavation contractor, Precision Excavating, placed and compacted on-site borrow for the haul road to the <br />south of Pond E dam. <br />Remarks: <br />The material tested generally met project specifications. <br />Please refer to the artached sheet for results of today's testing. <br />Verbal Discussions: <br />David Zehner of Precision Excavating was notified of today's test results. <br />J <br />