Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br /> <br />~~ <br />Project: Pond E Relocation <br />Location: Foidel Creek Mine <br />Glient: Precision Excavating <br />Work Performed: <br />Project No.: 95-2505 <br />Report No.: 14 <br />Date: 12/02/95 <br />Time: 1.5 <br />Mileage: a0 <br />EngrJTech: TT <br />As requested. we visited the project site twice on this date to conduct nuclear density test No.'s 42 through 43 on <br />the material being placed. <br />The excavation contractor. Precision Excavating, placed and compacted approximately 6" of Class 5 road base <br />matenal on the haul road B being constructed adjacent to the relocated pond E. <br />Remarks: <br />The matenal tested generally met project specifications with moisture contents being approximately 1.9°h below <br />optimum. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />David Zehner of Precision Excavating was notified of today's test results. <br />• <br />