Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />_ti <br />Project: Pond E Relocation <br />Location: Foidel Creek Mine <br />Ctient: Precision Excavadng <br />Work Performed: <br />Project No.: 95-2505 <br />Report No.: 13 <br />Date: 12/01!95 <br />tine: 1.5 <br />Mileage: 20 <br />EngrlTech: TT <br />As requested, we visited the project site on this date to conduct nuclear density test No.'s 40 through 41 on the <br />material being placed. <br />The excavation contractor, Precision Excavating, placed and compacted approximately 6" of Ctass 5 road base <br />matenal on [he haul road 8 being constructed atljacent to the relocated pond E. <br />In addition. we obtained a sample of the material, Sample No. 3, and returned it to our laboratory for modified <br />Proctor and classification testing. <br />Remarks: <br />the matenal tested generally met project specifications with moisture contents being 1.1% to 1.4% below <br />optimum. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />David Zehner of Precision Excavating was notified of today's test results. <br />