Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br /> <br />i <br />Project: Pond E Relocation <br />Location: Foidel Creek Mine <br />Client: Prec:sion Excavating <br />Work Pertorrned: <br />Project No.: 95-2505 <br />Report No.: f 2 <br />Date: f1/2f/95 <br />Time: f .5 <br />Mileage: 20 <br />EngrJTeeh: JK <br />As requested, we visited the project site on this date to conduct nuclear density test No.'s 36 through 39 on the <br />material being places. <br />The excavation contractor, Precision Excavating, placed and compacted approximately f 2" of 2 ~/2' minus pit run <br />sands and gravels on the haul road 8 being constructed adjacent to the relocated pond E and for the wash plant <br />access ramp. <br />Remarks: <br />The material tested generally met protect specifications wdh moisture contents being 3.0% to 3.4% below <br />optimum. <br />This report completes the compaction testing required for the subbase grade of the haul road. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />Dawd Zehner of Precision Excavating was notified of today's test results. <br />J <br />