Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />,-> <br />l J <br />Project: Pond E Relocation <br />Location: Foidel Creek Mine <br />Client: Precision Excavating <br />Work Performed: <br />Project No.: 95-2505 <br />Report No.: 11 <br />Date: 1120/95 <br />Time: 1.5 <br />Mileage: 22 <br />EngrJTecb: JK <br />As requested. we visited the project site on this date to conduct nuclear density test No.'s 32 through 35 on the <br />material being placed. <br />The excavation contractor. Precision Excavating, placed and compacted approximately 12' of 2 12' minus pit run <br />sands and gravels on the haul road B being constructed adjacent to the relocated pond E. <br />Remarks: <br />The material testes generally met project specifications with moisture contents being 3.8% to 3.0% below <br />optimum. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />David Zehner of Precision Excavating was notified of today's test results. <br />t <br />'~i <br />