Laserfiche WebLink
<br />j j III IIIIIIIIIIIII III <br />= STATE OF COLUI~lly <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (3031 866-3567 <br />fAX: (3031 832-8106 <br />January 5, 2001 <br />Mr. Todd K. Dysart <br />11481 CR 370 <br />Sterling, CO 80751 <br />Re: Todd Dysart Pit, M-2000-149, Permit Issuance -Construction Material Operation <br />Dear Mr. Dysart: <br />~~ <br />DIVISION OF' <br />MINERALS <br />b <br />GEOLOGYi <br />RECLAMATION, <br />MI NING•SAFETY; <br />sill o.•,en: <br />e~~emn. <br />Greg E. bValche~ <br />E~eculive Director <br />nechael8 Long <br />Drv~sion Direaar <br />On January 5, 2001 the Division of Minerals and Geology found Todd K. Dysart to have satisfied the applicable <br />requirements of C.R.S. 34-32.5-101 et ~. for obtaining a mining and reclamation permit. Therefore, a permit is <br />being issued. Two signed originals of the permit have been executed. We have kept one copy for our files and are <br />enclosing one copy for your use. Jt is your responsibility to comply with all of the terms of the permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your <br />permit. They have been incorporated into the permit by reference. We presume that you have a copy of all of <br />these materials; therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the <br />permit and the permit application at the mining operation as a reference for operating personnel, to help ensure <br />compliance with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consuhing the Construction Materials Rules and Regulations <br />and/or wntacting us to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rute 1.9 to Technical Revisions, and Rule 1. l 1 to Conversions. <br />3. On your permit anniversary date each year, January 5, you must submit an annual fee and an annual <br />report to us. The annual fee for this permit is $281.00. Please consult the Act, Rules and Regulations, and your <br />permit for specific annual report requirements applicable to your mine. <br />If you have any questions, please the contact the Division. <br />Sincerely, <br />MICHAEL B. L G <br />Division Director <br />MBL/ESC/bdc <br />Enclosure <br />