My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE122949
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE122949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:50 PM
Creation date
11/25/2007 10:59:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
12/1/2003
Section_Exhibit Name
4.23 Auger and Highwall Mining
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mining is designed for zero subsidence to prevent disturbance or damage to powerlines, <br />buildings, or other surface facilities, <br />4.23.2 Backfill and Grading Requirements <br />Highwall mining will be conducted in accordance with the backfilling and grading requirements <br />of 4.14. <br />4.23.2 Highwall Shall be Eliminated <br />Highwall mining is proposed to occur in areas previously mined with adequate material on hand <br />to backfill the pits with proper static safety factors for stability to the approved postmining <br />topography thereby eliminating all highwalls. Any minimal spoil material generated by the <br />hghwall mining operation will be buried at depth in the pit backfill. All coal seams mined will <br />be adequately covered by pit backfilling in conformance with the permitted PMT and reclamation <br />plan. No remnant highwalls will be left at conclusion of the reclamation activities attd no spoil <br />material will be place nn any outslopes. <br />Revision Date: 11/21/03 <br />Revision No.: TR -58 <br />Rule 4.23 4.23-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.