Laserfiche WebLink
e 4 <br />i!aM�r� <br />t <br />t. <br />�..�L• �_ • fit• ,iA �E�� <br />+4 <br />L� L. <br />F1 <br />a <br />(y . <br />jA <br />1. <br />7 , <br />t°' L <br />s- <br />r <br />By <br />By <br />By <br />1 <br />• •• ee •• <br />�ll� �YUkJU,1'7 -•fro, fi0n arPd IeS in Sections 17, i' the lath P.i -l. A coriplete legal description <br />a/ he found j, nitit <br />PREFARED BY <br />�AVIC )HIIPE, PE. NO. 5914 <br />REVISIONS <br />Date Description <br />Date Description <br />Date Description <br />- <br />Date: NOVEMBER 1978 Drawn LLH <br />Checked <br />u I <br />Scale: 1 = 300 Approved <br />}1 <br />z . <br />� I <br />O <br />AFFECTED AREA <br />� e <br />Permit #: —��/7 -OCR Confidental?: <br />F <br />= } <br />Class: EC[ /INfA /'&W ype -Seq.: <br />From- To: <br />Doc. Natll LGi� <br />I <br />n <br />% • 1 <br />* <br />a <br />Doc. Date ( if no date stamp): �S /7-79 <br />( <br />�� i. ..n �.. - r -. <br />n ` ��, e <br />f <br />a. ..Slit.., \�■. <br />R_E_CLl',h1AT!WP <br />PLAN (Fol a more detailed reclamation play ee Exhibit E) <br />1. <br />The intent of reclamation is to leave a series ut labs interconnected by land niasses to be used for camping, hiking <br />� <br />�EXISTING GROUND <br />APPROX. ELEV = 4985 (U.S.G.S.) <br />and fishing. <br />o <br />2. <br />The banks of the lakes are to be sloped at a ratio + ):l frori finished <br />p grade to 10 feet below the expected water <br />N <br />I <br />a <br />*' <br />of <br />�APPROX. WATER LEVEL <br />level with no slopes steeper than a ratio of 2:1. See detail this sheet; <br />3 <br />u g <br />(0 <br />7 <br />m N <br />— <br />S I T <br />3. <br />The lakes will be stocked with fish and `ne area lardssaoed with shrubs, Cass and existing trees. <br />1 -1 <br />" <br />C0 CD <br />y o PROPOSED FINISHED <br />GRADE — <br />r- <br />D <br />4. <br />The topsoil will be replaced at a - � .ininruir depth 0' ul-hes and then seeded a:itn a mixture of grasses as reconnn ended <br />j <br />� <br />LIMITS OF ° z <br />EXCAVATING z° <br />by the Soil Conservation Service. (See Exhibit_ L <br />�.. <br />C <br />The total cost of reclamation i. Pstimated to he 13,650 plus auynientation of an estimated 0.51 c.f.s. of water to <br />I <br />CC) <br />r- <br />can <br />CO <br />offset evaporation losses. The applir_ants intere in Priority No. 9 of the Rist and Goss Ditch is 4.27 c.f.s. of <br />t TYPICAL PIT <br />BANK CROSS SECTION <br />v <br />`O <br />=M <br />which a portion will be used for *his purpose. Srr = ,hibit G.) <br />PROPOSED LAKE lT(P) du ;caLE <br />= cu <br />HOGAN <br />MAIN OFFICE <br />/ OLHAUSEN INC. 2IU WEST EISENHOWER <br />BD5]r <br />CLIENT: <br />LOVELAND READY MIX CONCRETE, INC. <br />TIITLE: <br />Project Nor <br />NO. OF <br />SHEETS <br />SHEET NO. <br />_ <br />=o <br />—� <br />LOVE, nND. COLORADO <br />RECLAMATION MAP <br />Engineers — Planners — Surveyors BRANCH OFFICE <br />LOVELAND COLORADO <br />EXHIBIT F <br />360- 06 -01 -01 <br />3 <br />3 <br />Ph Otogrammetrists I06 ,5TH STREET <br />GREELEY. COLORADO B0631 <br />mommommommommommini <br />