Laserfiche WebLink
Colorado Mined Land Reclamation Division <br />` <br />BSTINATING FORM - BULLDOZER NOBS <br />. ............................... <br />Task 9: 1 Prep. by: LDO Task File Nees: M016 -1 <br />............ ......... ............. <br />Date: 06/08/92 pertit 1:1-92 -016 Mine: Penrose Ranches <br />............ ......... ................................. <br />Pertit Action: bond cale <br />Task Description: grade 1,000 1. ft.pit wall froa 11 to 3:1 <br />................... ............................... 6.......... <br />HOURLY EQUIPMENT COST <br />Class: 0 Revision <br />Job Condition Correction Factors <br />i_ TYpe/Seq: <br />" " "" " " "" " "' <br />Basic Machine: <br />Cat D6D <br />Horsepower: <br />110 <br />DApplication (Coal only) O Bond O Enforcement O Inspection <br />Blade Type: <br />Straight <br />Operator..........: <br />.......... <br />(avg.) <br />Attachtent 11: <br />HOPE Cab <br />Shift Basis: <br />Wily <br />0.90 <br />Attacksent 92: <br />N/A <br />515 <br />LCY /hr <br />Cost Breakdown: <br />1.00 <br />(gen.) <br />" " " "` <br />' " " " " " "" <br />Visibility........: <br />1.00 <br />Utilization % <br />(code Aka) <br />Ownership cost /hr <br />Job efficiency.... : <br />- 619.88 <br />N/A <br />Coapacted fill or esbankment <br />Operating A overhaul <br />cost /kr- dozer <br />: 618.67 <br />100 <br />- ripper <br />: 60.00 <br />N/A <br />Avg. puck gradient: <br />Operator coot /hr <br />% (net) <br />=.,920 68. <br />R/A <br />(Cat tbl) <br />Total egpt. unit cost /br <br />=.. 159.23 <br />. Total fleet cost /hr: <br />959.23, <br />MATERIAL QUANTITIES <br />................... <br />Initial $well Loose <br />Volute: 5,550.0 BCY Factor: 1.120 Volute: 6,216.0 LCY <br />............ .......... ............. <br />Source of quantity take -off: exhibit I <br />..................... ............................... <br />Source of est. swell factor: cat kadbk <br />................... ............................... <br />DOUBLY PRODUCTION <br />"" "` " " ""' "' <br />Class: 0 Revision <br />Job Condition Correction Factors <br />i_ TYpe/Seq: <br />Avg. push distance: <br />50 <br />ft, <br />' " ............................. <br />DApplication (Coal only) O Bond O Enforcement O Inspection <br />" " " "' <br />Operator..........: <br />0.75 <br />(avg.) <br />Unadjusted hourly <br />Mat. consistency.. t <br />0.90 <br />(Cat tbl) <br />dozer production: <br />515 <br />LCY /hr <br />Dosing tethod ..... : <br />1.00 <br />(gen.) <br />" " " "` <br />Visibility........: <br />1.00 <br />(avg.) <br />Material consistency: <br />Job efficiency.... : <br />0.83 <br />(Isk /day► <br />Coapacted fill or esbankment <br />Transtission type.: <br />1.00 <br />( PS 1 <br />Grade adjustment..: <br />1.17 <br />(Cat tbl) <br />Avg. puck gradient: <br />20.00 <br />% (net) <br />Altitude adj...... <br />1.00 <br />(Cat tbl) <br />" " ""` <br />Material weight...: <br />0.71 <br />(Cat tbl) <br />Avg. site altitude: <br />5200 <br />ft. <br />Blade type........: <br />1.00 <br />(S or U) <br />......... <br />. ............................... <br />Material weight <br />3250.00 <br />lb /LCY <br />Net Job Correction : <br />0.58 <br />Mat. Deter.: <br />......... <br />............. <br />Gravel - Pitrun <br />Adjusted Unit Prod.: <br />311.60 <br />LCY /hr <br />...... ............................... <br />............. <br />Adjusted <br />Fleet Production: <br />317.60 <br />LCY /hr <br />JOB`COST <br />."'"'...." <br />Fleet size : <br />, ....1 <br />Dozer(s) <br />Total Job Tice: <br />19.57 <br />Boars <br />Unit Cost <br />10.186 <br />/LCY <br />Total Job Cost: <br />91,159.27 <br />Pernit Number + , l �,� <br />Clan: erma <br />Class: 0 Revision <br />i_ TYpe/Seq: <br />Class: � Report D Hydro OGeneml <br />_ <br />Doc type_ <br />DApplication (Coal only) O Bond O Enforcement O Inspection <br />1 r- z rlk-w- <br />G,1&,�,�L <br />r' I <br />r <br />r <br />iliiiulilitN9l�lliillilill�lh "III ". <br />0 0 0 1 0 5 2 0 <br />