Laserfiche WebLink
<br />EXHIBIT "B" <br />Mining Plan: <br /> <br />A. The method of mining to be employed will involve removing gravel from the river- <br />bed by methods of front-end loaders, or other heavy equipment, and delivering <br />the same to an onsight portable crusher for processing of gravel and sand. <br />B. Earth moving will only involving digging replaceable ?ravel out of the riverbed. <br />C. There will be no diversion of water on the site other than for washing or <br />cleaning the gravel and the same shall be returned to the river. <br />D. The size of area to be worked at any one time will not exceed five acres. <br />E. There will be no major or moderate disturbance. <br />F. The timetable required to describe the mining operation will begin in the Spring, <br />as weather permits, and work will end in the Fall, as dictated by the weater con- <br />ditions. <br />