My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE122740
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE122740
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:41 PM
Creation date
11/25/2007 10:43:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999005
IBM Index Class Name
Permit File
Doc Date
5/11/1999
Doc Name
RESPONSE TO BN & SF RAILROAD COMMENT LETTER OF 4-6-99 FOR THE NORTH RIVER PIT FN M-99-005
From
BANKS AND GESSO LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ <br />~; <br />~ III IIIIIIIIIIIII III <br />Banks and Gesso, LLC <br />(303)274-4277 <br />May 10, 1999 <br />Mr. Larry Oehler <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />Department Of Natural Resources <br />1313 Sherman Street, Room 213 <br />Denver, Colorado 80203 <br /> <br />720 Kipling St.,Suite117 <br />Lakewood, Colorado 80215 <br />Fax (303) 274-8329 <br />1'~~:E111E® <br />MAY 11 1999 <br />,.,a,~i <br />_~!.:.._.: _.:,~. s & Geology <br />RE: Response to BN & SF Railroad Comment Letter of April 6, 1999 for the North River <br />Pit, file No. M-99-005 <br />Dear Larry: <br />I received your letter on May 3, 1999 regarding the referenced comment letter dated <br />April 6 from the BN & SF Railroad. <br />The closest that the excavation for the South Borrow Pit Area comes to the active <br />railroad track is 350 ft. The railroad siding tracks that curved to the northwest have been <br />abandoned. We will be showing on the mine plan map the short power line that exists <br />near the south boundary of the permit area and would be located within 200 ft. of the <br />currently shown excavation area. We are reducing the excavation area slightly on the <br />mine map to stay 200 ft. away from the power line. That map change will be shown on <br />the revised maps to be submitted on or before May 15,1999. <br />Two other issues have to light that continue to be "adequacy concerns" of yours. Ed Kite <br />and myself have discussed them and have come to a solution in order to resolve these <br />issues: <br />1.) We are removing the installation of an asphalt batch plant at this site. Therefore, the <br />need for a SPCC plan is not required. The text and mine plan map will reflect that there <br />will be no batch plant located on this site. These changes will be submitted on or before <br />May 15,1999. <br />2.) We have decided that at this point in time there will be no proposal to mine the <br />southwest area of the proposed mining permit where the wetland areas are located. <br />This area will be left as is. The mine plan map and phases will be changed to reflect <br />this. Phase 2 will become Phase 1, etc. Mining will begin east of the North La Junta <br />Sanitation District's easement and proceed east and north. That map change will be <br />shown on the revised maps to be submitted on or before May 15,1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.