Laserfiche WebLink
<br />-5- <br />Exnioit ~;-2 - fgap <br /> <br />Attach a map of sufficient quality to determine the location of the permit <br />area on rile ground. Also show the access road to the mine. This map may be a <br />topoyraphic map, county snap, or accurate hand-drawn snap. <br />Exnioit J -Wildlife, 'Water Resources, Soils Vegetation Information <br />Co it act the local Division of Wildlife office for a wildlife impact <br />assess~neht and attach their statement to this application. <br />2. Contact the local office of the Soil Conservation Service for an on-site <br />soils and vegetation information statement. Attach their report to this <br />application. <br />3. dater Resources <br />A. How much water will oe used in conjunction witn thisinining <br />operation? Where will you acquire this water? Do you have appropriate <br />inuustrial-use water rights? <br />NJN~ <br />(Water rignts are required for such itei~is as dust control, processiny, <br />ponding, etc.) <br />d. if pondiny is to oe part of your reclamation plan, identify the <br />water right associated with the proposed ponds. <br />Exnioit E -Reclamation Plan <br />The operator is encourayeu to consult with their local Soil Conservation <br />Service representative far on-site reclamation recommendations, and review <br />Rule b. <br />Will you be following the reclamation guidelines provided by the <br />Division of Wildlife and/or the Soil Conservation Service? ~L 5 <br />2. Slopes will oe yraded to a maxiawm )Horizontal to vertical) slope of: <br />~ - ) (example - 3:1). <br />s. If applicaole, the depth of overouraen to be replaced will be <br />a. Topsoil will be replaced to a ~niniinwn deptn ofd % Are ,~~~_ inches. <br />range <br />ti. Staff recommenus that topsoil and subsoil be disced to at least o" to <br />provide for oinding and root penetration. <br />o. The site will be planted, late fall or early spring? <br />