My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE122701
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE122701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:39 PM
Creation date
11/25/2007 10:41:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
POSTMINING LAND USE
Section_Exhibit Name
APPENDIX O
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF WATER RESOURCES <br />OFFICE OF STATE ENGINEER <br />SPECIFICATIONS TO GOVERN THE CONSTRUCTION OF A LIVESTOCK WATER TANK <br />• <br />Preparation of Foundation far Dam-All vegetable matter of every description, including roots to a depth of two <br />feet, shall be removed from the entire area upon which the door will rest, together with boggy or unstable materials <br />and deposited outside the toes of the dam. The banks of the stream channel shall be dressed to a slope of about lil_:1. <br />A bonding trench, aa•ith sloping sides and a bottom width of not less than 5 feet and depth of 4 feet, Shall then be <br />excavated beneath the center line of the dam the full length thereof, which trench shall be refilled with the most imper- <br />vious materials available. The toundatium cf the dam shall then be lightly plowed lengthwise of the dam, to provide <br />proper contact between the foundation and the dam embarkment. <br />PlaeiDS of Dam Embankment^The materials shall be placed in the bonding trench and in the embankment o[ the <br />dam in layers not exceeding ti inches in thickness, after which each layer shall be thoroughly compacted by a heavily <br />loaded disc cultivator, a corrugated or sheep's foot roller, the treads of a caterpillar or trucks, or by livestock used in the <br />construction. During [he construction period, the top of the embankment shall be maintained as a horizontal plane the <br />full width and length thereof. and no side dumping of materials shall be permitted. The materials shall at all times <br />contain sufficient moisture to provide proper compaction. Puddling of material with water shall not be permitted. <br />No frozen material or large clods or scones shall be incorporated in the dam. The upstream face of the dam shall be <br />constructed with a slope not steeper than ? i,~:l, and the downstream face on a slope not steeper than 2:1. The crest or <br />top of the finished dam shall be not less than 8 feet in width. <br />The upstream lavo-thirds of the dam shall be constructed of the most impervious materials, such as clay loam, or a <br />mixture of clay and sand. and the downstream one-third of more pervious material, such as sand or gravel" The up- <br />stream face of the dam shall. be adequately protected against wave action by stone riprap, or~other suitable 7aterials <br />when required. <br />OatleO-Should the state engineer so require, there shall be located beneath the dam an outlet pipe not less than 8 <br />inches in diameter, equipped avith a control valve attached rA the upstream end of the pipe, together with suitable <br />mechanism for operating the valve. Such outlet pipe shall be provided with cutoff collars. The pipe shall be placed in a <br />trench bottomed in stable formation, and shall be completely surrounded with well compacted impervious :materials. <br />Splllway-For the protection of the dam, an adequate spillway shall be constructed around one or boat ends of the <br />dam, of sufficient avidth to provide a capacity to carry the entire discharge from the drainage basin above the dam <br />during periods of unusual runoff. The spillway shall be located in stable formations not easily eroded, and shall extend <br />to a point well downstream from the dam. The following table shall be used to determine the necessary width of spill- <br />way to meet the above requirements. The top of the dam at all points shall be not less than 4 feet above the bottom of <br />the spillway. <br />The following table shows the widths of spillways for corresponding drainage areas with an allowance of a mini- <br />mum freeboard between the maximtun high water line and top of dam, of 2.3 feet, and maximum velocities of 3.5 feet <br />ppr second of time. <br />AREAS OF LOW RAINFALL INTENSITY AREAS OF HIGFI RAINFALL INTENSITY <br />AREA OF :. °.QUIRED WIDTH OF AREA OF REQU•P:D WIOTM OF AREA OF REQUIREL WI:ITY C• <br />Oa.A1NAGE BASIN SPILLWAT "W" AT DRAINAGE BASI N SPILLW AT "W" AT DRAINAGE BASIN SPILLWAY "W" AT <br />ABOVE DAM NARROWEST POINT ABOVE DAM NARROWEST POINT ABOVF DAM NARROWEST POINT <br />IN ACRES IN FEET IN ACRES IN FEET IN ACRES IN FEET <br />YO 8 p0 8 100 76 <br />40 9 40 9 /60 84 <br />60 11 60 11 600 90 <br />BO 14 80 18 Sb0 99 <br />100 16 100 22 600 106 <br />710 21 120 26 700 ll7 <br />Teo Ys 14o ao coo lsa <br />zzo s9 16o a/ 900 loo <br />260 73 180 a7 1000 150 <br />300 35 200 ~ /7 1700 360 <br />750 3e 2Y0 /8 1200 169 <br />/00 /Y 240 60 1300 176 <br />450 // 260 67 1400 18T <br />500 /i 260 57 1500 196 <br />600 61 700 60 1600 E03 <br />700 65 320 i3 1700 fl! <br />800 59 ]40 86 1800 219 <br />900 a2 ]60 70 1900 2Yb <br />1000 66 380 7] 2000 Eii <br />ALL AREAS EAST O'_•' THE CONTINENTAL DIVIDE BELOW .AN ELEVATION OF 7000 FEET, ARE CONSID- <br />ERED AS BEING IN THE HIGH RAINFALL INTENSITY ZONE. <br />The above spillway widths may be reduced at a point 50 fact below intake, by 25 per cent, where the spillway is <br />located the full length thereof in hard clay or shale, and by 50 per cent when located in hard rock formations, i[ the <br />elope or grade of the bottom a increased accordingly. The grade for clay and shale formations should be 0.30 toot per <br />100 feet, and for rock formations 0.00 foot per 100 feet. The avidth of the entrance to the spillway must in all cases be <br />one-third wider than shown in the table, and the bottom should slope from the lower end o[ the funnel section, toward <br />the reservoir 1.0 foot in the dis[nnce of 50 feet, and the slope downstream should be 0.25 foot in a distance of 100 feet. <br />Borrow Pits-Pits, from which materials are taken to build the dam, shall be cleared of all vegetable matt°r, and <br />nn material shall be borro',ved within a distance of 50 feet o1 any part of the dam. Materials excavated from the spill- <br />way, when suitable, may De used in building the dam. <br />
The URL can be used to link to this page
Your browser does not support the video tag.