Laserfiche WebLink
<br />EXHIBIT B <br />MINING PLAN - I.10NTOYA PIT <br />The Montoya Pit is a new gravel pit. The amount of <br />topsoil to be removed ranges in depth from 0 ft. to 12 ft.. <br />The gravel ranges in depth from 15 ft. to 25 ft.. <br />The existing slope of the property is approximately <br />2:1 slope <br />The topsoil and overburden shall be removed with a <br />dozer and stockpiled to the .:est of the pit. <br />The direction of mining will be from the ~ast to <br />the ';;est. It will be dozed and loaded into a rock <br />crusher, the processed gravel will then be stockpiled <br />and hauled. <br />The mining •.aill start when we get the permit. <br />The mining will end when the gravel is depleted or <br />the lease ends, whichever comes first. <br /> <br />