Laserfiche WebLink
cut from the existing topography. Of this, approximately 12,000 CY was placed in the waste rock disposal site. <br />This material is not suitable for construction proposes, and thus was placed in the waste rock pit. <br />• The required fill material was borrowed from the spoil adjacent to the TCC portal area. The borcow azea is shown <br />on Map 24. The borrow area was graded level, and thus will provide additional storage area. The side slopes of <br />the borcow azea was gaded to 2H:1 V. <br />Approximately 100 CY of material was removed from the borrow area and used as bedding and packing for <br />culverts D-2-C and D-2-F. Coal transferred. from the stacker tube feed belt to the stacker tube is stockpiled around <br />the stacker tube. The stockpile will accommodate up to 200,000 tons of coal; however the typical size will be <br />40,000 tons. As shown on Map 24, a portion of existing Haul Road B (see CYCC Permit C-81-071), will be <br />covered up by the coal stockpile and reclaim tunnel. This will require that the haulroad be routed around the north <br />and west sides of the coal stockpile. The haulroad profile and typical X-section is provided on Map 30A. <br />• <br />u <br />PR 03-06 2.05-252' 05/06/04 <br />