Laserfiche WebLink
' <br />-r ~ ~ <br /> <br />... <br />:::, <br />.,.. <br />Coastal <br />the EnerpY PeaPle <br />September 18, 1997 <br />Attn: Lloyd V. "Buck" Barnhart <br />Barnhart Agency, Inc. <br />212 West 13th Street <br />Pueblo, CO 81003 <br />Attention: Lloyd V. "Buck" Barnhart <br /> <br />RF_CEIVEC <br />OCT 0 g 1991 <br />DiyiSiCn of sunercis a uec~,:ny <br />Re: Application requirements for HARTMAN PIT MLRB 112 Permit for construction aggregate <br />mining within 200 feet of CIG's natural gas transmission pipeline Loop (24B-16") ROW under <br />State Permit No. M97-e5'}112, located in SW'/=NE'/. of Sec 20, in T21S, R63W of Pueblo <br />County, Colorado of the area effecting CIG pipeline. <br />Dear Mr. Barnhart: <br />This is in response to your letter of June 19, 1997 advising CIG of the proposed gravel mining <br />operations located in the above described subject. CIG currently owns, operates, and maintains the <br />24B-16" CF&I - S. Pueblo Loop high pressure natural gas transmission pipeline which crosses the <br />subject area. The Maximum Allowable Operating Pressure (MAOP) is 400 psig for this pipeline. <br />CIG's referenced pipeline traverses this area, however, if the following conditions are observed with <br />regard to the pipeline, CIG has no objection to the mining operation. <br />The mining operations will not encroach within fifty (50) feet of either side of CIG's pipeline <br />facility. A minimum slope of 4:1 will be maintained as a back slope to the existing right of way <br />easement. <br />2. The existing cover over the pipeline must not be lowered. <br />3. Haul roads or equipment crossings over CIG's right of way easement may require an increase <br />in the amount of cover over the pipeline. Should a road base be installed that would encroach <br />on this cover, then a stress analysis would need to be performed based on actual equipment <br />loading information. Engineering would prefer to have actual road cross-sections, at the <br />pipeline crossings, in order to perform the load analysis. <br />4. No blasting shall be allowed unless prior approvals are obtained from CIG. <br />5. CIG will not permit any permanent structures to be constructed within the pipeline easement <br />area without first obtaining written permission. <br />6. Contact the Utility Notification Center of Colorado at 1-800-922-1987 at least two working <br />days prior to the commencement of any mining activities on the property and such construction <br />shall be made only when a representative of CIG is present at the time of construction. <br />7. No work within CIG's easement area will commence prior to consulting a CIG representative <br />at an on site meeting. Contact Mr. Jammie Shasteen or Mr. Ken Bethel, CIG Devine Station, <br />37351 E. Highway 50, Pueblo, Colorado 81006, Phone (719) 948-3321 to schedule such <br />meeting. <br />III IIIIIIIIIIIII III <br />Colorado Interstate Gas Company <br />A SOBSIOIAFY OF rNE LOASlAL CORPORATION <br />P 0 BOX IOH: • COLORA00 SPRINGS C0909dd • lIB'dlJ~?J00 <br />