Laserfiche WebLink
3.09 Slurry Wall Protection <br />A stabilizing cover, which is used above SB slurry walls, is not needed for the SCB backfill. <br />Erosion of the backfill slope towards the slurry wall due to wave erosion should be <br />monitored. Current backfill slope conditions suggest that wave action has had minimal to no <br />impact to the slope. If significant erosion into the backfill slope is observed, "bank run" <br />gravel should be placed on the slope to mitigate future erosion. <br />3.10 Site Reclamation <br />After completing backfill placement, areas disturbed by construction will be regraded to <br />preconstruction conditions and seeded in accordance with the mining permit. <br />5 <br />