Laserfiche WebLink
5. Monitorin~Reclamation Success <br />Monitoring the reclamation on an ongoing basis will allow minor revisions to assure successful <br />reclamation. The operator plans to use the local SCS office in Delta County to assist in determining <br />the ability of the reclaimed land to control erosion. If minor changes or modifications aze needed to <br />the seeding and reclamation plan, revision plans will be submitted to the Division as required. It is <br />hoped that the Division will provide assistance in evaluating the success of the ongoing reclamation <br />process. All areas disturbed and reclaimed and any other important items regazding the reclamation <br />will be submitted in the annual reports to the Division. <br />North Fork Pit March 04 3$ <br />