My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE122596
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE122596
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:34 PM
Creation date
11/25/2007 10:33:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004025
IBM Index Class Name
Permit File
Doc Date
4/13/2004
Doc Name
110c Appl.
From
Oldcastle SW Group Inc. dba Four Corners Materials
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scenario 2 -After Mining <br />1) The permanent lake will be approximately 6.6 acres in size, which may fluctuate between 6.2 <br />acres and 6.7 acres, depending upon the river level and water inflow from irrigation uphill. Since <br />the lake bottom and sides aze always saturated due to the level of alluvial water, no losses will occur <br />due to infiltration. Losses will occur due to evaporation at the water surface. Based upon evapora- <br />tion data for this location from the State Engineers office and precipitation data for this azea, this <br />pond will evaporate 42 inches or 3.5 acre-feet of water per acre of water surface. Since the existing <br />pond will be absorbed by the new lake and the pond already has adjudicated water rights, this azea <br />must be subtracted. This is an area of 0.45 acres. Therefore, the azea of new water surface is only <br />6.2 acres. This results in a consumptive use of 21.7 acre-feet annually. <br />Since the site was previously used for alfalfa imgated field, the consumptive use for this past irriga- <br />tion is calculated at 1.72 acre-feet per acre per year of total effective precipitation and loss in the <br />plants. This is a credit of 10.66 acre feet ner yeaz. <br />Therefore the actual consumptive use after mining will be 21.7 ac ft/yr - 10.66 ac-fUyr = 11.04 acre <br />feeUvr• This will occur every year that the lake is in place. <br />For the yeazs of mining, a substitute water supply plan will be submitted to the Division of Water <br />Resources for 2.59 acre feet per yeaz. After mining, this amount will be changed to 11.04 acre feet <br />per yeaz. These are the amounts that will be supplemented in the augmentation plan submitted to <br />the Division of Water Resources. The landowner will maintain this augmentation plan after the site <br />is reclaimed. <br />Nor[h Fork Pit Mazch 04 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.